Loading video...

Video Failed to Load

Go Home

Two world-first unveilings today: 1. The Aalo Atomics full-scale reactor prototype 2. The factory that builds it Both equally groundbreaking. Both equally important. Factory-built 10 MWe fission reactors, purpose-built for data centers. To power the next era of intelligence.

12,993 views • 1 year ago •via X (Twitter)

11 Comments

Fifty Years's profile picture
Fifty Years1 year ago

@AaloAtomics The factory is the product.

Seth Bannon's profile picture
Seth Bannon1 year ago

@AaloAtomics Correct

Range ETFs's profile picture
Range ETFs1 year ago

The nuclear renaissance is here! Enabling the transition to low-carbon energy, $NUKZ focuses on companies revolutionizing the nuclear industry, from reactor design to fuel management. Consider taking part in the renaissance.

Matt Loszak's profile picture
Matt Loszak1 year ago

@AaloAtomics @fiftyyears is the best. Thank you for believing in us early Seth & team! Onwards…

Seth Bannon's profile picture
Seth Bannon1 year ago

@AaloAtomics @fiftyyears Such a pleasure to be able to support you!

Chris Taylor's profile picture
Chris Taylor1 year ago

@AaloAtomics LOL ~ @valaratomics had some curtain issue with their unveiling too! It's one thing to drop a reactor, it's a completely different thing to drop curtains. 🤣

Seth Bannon's profile picture
Seth Bannon1 year ago

@AaloAtomics @valaratomics Rigging is no joke!

Julian Shapiro's profile picture
Julian Shapiro1 year ago

@AaloAtomics aalo is INCREDIBLE

Seth Bannon's profile picture
Seth Bannon1 year ago

@AaloAtomics True, true

Everest Brady 🏔️'s profile picture
Everest Brady 🏔️1 year ago

@AaloAtomics This is beautiful Seth, thank you for sharing. Glad you got to go! My family is a very small investor in Aalo and very glad to see this

Seth Bannon's profile picture
Seth Bannon1 year ago

@AaloAtomics Wonderful company

Related Videos

At 12:20am on July 4th in the Idaho desert, I watched dozens of engineers hold their breath. Then the neutron counters confirmed it: self-sustaining chain reaction. The Aalo Atomics reactor was critical! Everyone erupted. Cheers, hugs, and a few tears. Three years ago this company was an idea on a whiteboard. We backed them then. This weekend they took a full-scale core critical – the first new sodium-cooled reactor in America in over four decades. Built in under 8 months from groundbreaking. The federal deadline for criticality was July 4th. They made it 20 minutes in. Criticality means the chain reaction is self-sustaining. Every fission triggers exactly one more, no external neutron source needed. It happens at near-zero power. It proves that the core geometry, the fuel, and the control systems all behave exactly as modeled. What makes this one different: the core Aalo took critical is already sized for 30 MW thermal / 10 MW electric once coolant and power conversion are added. That's roughly an order of magnitude larger than the other startup reactors that recently went critical. And this design IS the product: five reactors around one turbine, a 50 MW factory-built pod purpose-designed for AI data centers. No major redesign needed. From here: power ascension to 30 MW thermal, endurance runs, turbine sync, then powering a co-located data center in 2027. In 1951, this same desert made the first electricity from atomic energy. Enough for four lightbulbs. 74 years later, the lightbulbs are GPUs. Second atomic age. Same desert. So grateful I got to see it!

Seth Bannon

41,253 views • 19 days ago

We’ve gone critical. At 12:20 am on July 4th, Aalo sustained a controlled fission chain reaction for the first time. We have officially surpassed the goal of President Trump’s Executive Order 14301, achieving 4 advanced nuclear reactor criticalities by America’s 250th birthday. This is a zero-power criticality to validate our supply chain, reactor physics and control systems for our 10 MWe full-powered reactor, the Aalo-X, targeting power operations next year. Everything was built at full scale: fuel, moderator, control systems, etc., so we understand system performance at its commercial scope. That also meant tackling four of the most difficult things in nuclear with this criticality milestone: ✅ Ground-up construction of our reactor facility ✅ Manufacturing the reactor in our factory and shipping them by road ✅ Assembling our own fuel assemblies using commercial UO2 ✅ Standing up training, safety, and operational programs to become our own nuclear operator I am proud to say we have accomplished all four goals, along with achieving criticality. The reactor building was constructed in 36 days and construction to criticality was achieved in under 8 months. That’s the fastest nuclear build in the last 80 years. A massive congratulations to the Aalo Atomics team and our partners. Many thanks to Idaho National Laboratory, the DOE-Idaho Operations Office, and the Office of Nuclear Energy for their immense support in enabling this milestone and dedicated to the American nuclear resurgence.

Yasir Arafat

99,083 views • 19 days ago