正在加载视频...

视频加载失败

🚨 Update. Phase 3 of freight testing involves a push-pull configuration with two locomotives, one at the front and one at the rear, hauling 20 container-loaded freight wagons from Tema through Ashaiman, Shai Hills, Doryumu all the way to the Mpakadan. 🎥: StateOfGhAffairs

72,903 次观看 • 25 天前 •via X (Twitter)

0 条评论

暂无评论

原始帖子的评论将显示在这里

相关视频