Video wird geladen...

Video konnte nicht geladen werden

Zur Startseite

We successfully tested the rapid retract system yesterday, simulating disconnect during a New Glenn launch. The retract system ensures the transporter erector is quickly positioned away from New Glenn at liftoff to provide flyout clearance. We’ve been out on the pad testing since late May and plan to roll...

242,022 Aufrufe • vor 2 Jahren •via X (Twitter)

0 Kommentare

Keine Kommentare verfügbar

Kommentare vom Original-Post werden hier angezeigt

Ähnliche Videos

🚨ARTEMIS II UPDATE - NASA Repairs Helium Flow Issue Inside VAB; Preparing For SLS Rollout After returning to the VAB on February 25th; NASA engineers traced the helium flow issue to a seal inside a quick disconnect in the launch vehicle stage adapter. The seal had obstructed the pathway that allows helium to flow from ground systems into the upper stage. Technicians removed and reassembled the quick disconnect hardware and have already begun validating the repair by running helium at a reduced flow rate through the system. Engineers are now assessing what caused the seal to become dislodged to ensure the issue does not recur. Meanwhile, additional work is underway across the vehicle: • Activating a new set of Flight Termination System (FTS) batteries ahead of full retesting • Replacing flight batteries on the upper stage, core stage, and solid rocket boosters • Charging Orion’s Launch Abort System batteries • Replacing a seal on the core stage liquid oxygen feed system (work began March 2) • Preparing to reassemble the oxygen tail service mast umbilical plate and conduct integrity testing Teams will continue work in the coming weeks as NASA prepares to roll the Space Launch System and Orion spacecraft back to the pad later this month, keeping a potential April launch opportunity in view. 🕘Launch T-0: April 1, 2026 📅Launch Window: 6:24PM - 8:24PM EST 🔁Additional opportunities throughApril FOLLOW for latest Artemis II updates! 📸: Zac (Zachary "Astro" Aubert) for TLP

The Launch Pad

20,645 Aufrufe • vor 5 Monaten

Unique footage has emerged showing remote control of interceptor drones. The 190th Training Center of the SBS reportedly used a drone-interceptor to shoot down a Shahed UAV remotely, with the pilot located at a significant distance from the launch site. The system used was LITAVR, developed by FDrones. According to the company, an operator can control the interceptor from hundreds of kilometers away from the launch point. The F7 LITAVR is already a well-known and highly effective system. As a reminder, here are the technical details (this is all open-source information): Development of the system began in autumn 2024. It was successfully tested and officially adopted in summer 2025. Serial production and deliveries to the military started in autumn 2025. Maximum speed: 350 km/h Flight time: up to 15 minutes Equipped with two cameras: daytime and thermal imaging The officially stated tactical range is 36 km, though in practice it can reach up to 60 km and operate at altitudes of up to 9.5 km. The warhead (separately codified) weighs 500 g. Detonation can occur via kinetic impact, self-destruction upon contact with the target, or manual activation by the operator. The system uses inertial guidance without GPS and features automatic terminal guidance (“last mile” / target lock system). At present, it reportedly destroys hundreds of targets per week, including Shaheds, Gerberas, Molniyas, Orlans, Lancets, and others. What is fundamentally new? Until now, mobile air defense fire groups and frontline crews using interceptor drones required a qualified pilot on-site. It has now been successfully demonstrated that a different tactic is possible: pilots can operate from protected, remote locations. The only requirement is internet access at both the control center and the launch site. Ukraine’s defense sector continues to develop innovative solutions. 📹 Oleksii Kopytko/Facebook

Anton Gerashchenko

22,311 Aufrufe • vor 4 Monaten