10 Comments
Comments from the original post on X (Twitter)

@EOdileke
No. Itโs not an issue of measurement and fabrication. The facility this piece of equipment has to be mounted cannot be adjusted simply because of a bridge. The issue here is Journey Management: the transportation route not adequately surveyed to identify obstacles.
23 likes

@Timmynaijaa
Is NNPC this dumb? They can't calculate journey obstructions?
5 likes

@0xNode
Double jeopardy. The wrong trailer bed has been used. Lower trailer beds will also be affected by bad road. Best solution is alternative route or a bridge bypass which is not usually factored in our road design
5 likes

@DrBrown51430169
This is lottoo along Lagos Ibadan express, a similar crash had occurred of recent. The height of the bridge will not let huge construction access that route, the wall on of the bridge is cracked from the previous collision
4 likes

@P_antidote
Poor routing.
3 likes

@gurl_lambo
What is yhisss?
2 likes

@thelordmenkuzy
Anyone notice the cracks on the bridge?
2 likes

@MesharcServices
Common sense should tell them to use lowbed truck for such equipment.
2 likes

@olulshola
This is Loto bus stop before Mowe, the bridge is too low, a trailer once hit the bridge if you could notice the crack
2 likes

@Nanaezze
Just know as this machine enter some looting of natural resources disappear be that
1 like
