Wetin be this?? 😳
@ChuksEricE212 тыс. подписчиков
843 990 просмотров
10 комментариев
Комментарии из оригинального поста в X (Twitter)

@EOdileke
No. It’s not an issue of measurement and fabrication. The facility this piece of equipment has to be mounted cannot be adjusted simply because of a bridge. The issue here is Journey Management: the transportation route not adequately surveyed to identify obstacles.
23 отметки «Нравится»

@Timmynaijaa
Is NNPC this dumb? They can't calculate journey obstructions?
5 отметок «Нравится»

@0xNode
Double jeopardy. The wrong trailer bed has been used. Lower trailer beds will also be affected by bad road. Best solution is alternative route or a bridge bypass which is not usually factored in our road design
5 отметок «Нравится»

@DrBrown51430169
This is lottoo along Lagos Ibadan express, a similar crash had occurred of recent. The height of the bridge will not let huge construction access that route, the wall on of the bridge is cracked from the previous collision
4 отметки «Нравится»

@P_antidote
Poor routing.
3 отметки «Нравится»

@gurl_lambo
What is yhisss?
2 отметки «Нравится»

@thelordmenkuzy
Anyone notice the cracks on the bridge?
2 отметки «Нравится»

@MesharcServices
Common sense should tell them to use lowbed truck for such equipment.
2 отметки «Нравится»

@olulshola
This is Loto bus stop before Mowe, the bridge is too low, a trailer once hit the bridge if you could notice the crack
2 отметки «Нравится»

@Nanaezze
Just know as this machine enter some looting of natural resources disappear be that
1 отметка «Нравится»
