When Cerebras started, data centers were built for roughly 5 kW per rack.
@MilksandMatcha35K followers
24,973 views
12 Comments
Comments from the original post on X (Twitter)

@718Maven
the same CTO that sold all his shares?
9 likes

@alexanderbittan
Just bought 15,000 shares! This company is under estimated big time!
4 likes

@alexanderbittan
Excited to watch this !
2 likes

@MilksandMatcha
thanks Alex!
2 likes

@WHobbs84
Still down 69%
2 likes

@VentureWeb3
Stop pls,这样的视频发得越多,反而让FUD群体把你们的行为当作一场表演,拿出财报数据砸他们脸上。
1 like

@donmarcos_watts
The underrated part is what that does to the building. 100 MW of IT at 5 kW/rack was ~20,000 racks. At 150 kW it's ~670. Same power bill, a fraction of the floor. The bottleneck moved from square footage to switchgear, chillers and the grid connection.
1 like

@0xMaxChen
One of best PR teams in the industry. shipping videos more than another other large 10b+ listco I believe

@SoumilBhandari
Curious about the 5:39 part. With weights living in on-wafer SRAM (44 GB on WSE-3), precision seems to directly set how many wafers a model needs: FP8 vs BF16 roughly halves it. What precision do you serve the big models at today?

@derrick_dao
5 kW to 100-200 kW a rack is a 20-40x jump in density, and the grid never moved with it. That's why the real shortage stopped being silicon and became substations — copper, transformers, and the megawatts to feed them. The chips were the easy part of this buildout.

@Dreaming09092
a "good" CTO, pitty that he hate your company by dumping all his shares👎

@terminulll
5 kw used to be the entire rack budget. now it's a rounding error.