Loading video...

Video Failed to Load

Go Home

World’s second-largest government hospital by bed capacity is currently under construction in Patna, Bihar 🇮🇳 • 100% Bihar Government project • Project cost: ₹5,500 Cr • Total capacity: 5,462 + 400 Beds India's the best Construction company Larsen & Toubro (L&T) at work

119,209 views • 7 months ago •via X (Twitter)

0 Comments

No comments available

Comments from the original post will appear here

Related Videos

𝗜𝗡𝗙𝗥𝗔𝗦𝗧𝗥𝗨𝗖𝗧𝗨𝗥𝗘 𝗧𝗮𝗻𝘇𝗮𝗻𝗶𝗮 𝗰𝗼𝗺𝗽𝗹𝗲𝘁𝗲𝘀 𝗰𝗼𝗻𝘀𝘁𝗿𝘂𝗰𝘁𝗶𝗼𝗻 𝗼𝗳 𝗘𝗮𝘀𝘁 𝗔𝗳𝗿𝗶𝗰𝗮'𝘀 𝗹𝗼𝗻𝗴𝗲𝘀𝘁 𝗯𝗿𝗶𝗱𝗴𝗲 ◾The $300 million Magufuli Bridge on Lake Victoria will provide a crucial link between Tanzania and neighboring Uganda, Rwanda and Burundi ◾The 3.2-kilometre bridge will cut travel time at the area from 2 hours to just 4 minutes October 8, 2024 𝘽𝙮 𝙏𝘽𝙄 𝙍𝙚𝙥𝙤𝙧𝙩𝙚𝙧 Dar es Salaam Tanzania has completed the construction of the longest bridge in East Africa at a cost of around $300 million as the country continues to invest heavily in upgrading it's infrastructure. Construction of the 3.2-kilometre Magufuli Bridge on Lake Victoria was initiated by the former president in December 2019. President Samia Suluhu Hassan, who came into office in March 2021, is expected to officially inaugurate the mammoth project before the end of the year. The project was initially scheduled for completion in July 2023, but construction was delayed by the Covid-19 pandemic. Originally known as the Kigongo-Busisi Bridge, the Chinese-built mega infrastructure was renamed Magufuli Bridge in honour of the former president. The project is being developed by the China Civil Engineering Construction Group (CCECG) and China Railway. The bridge was entirely financed by the government of Tanzania through its own revenues. The People's Daily, the official newspaper of the Central Committee of the Chinese Communist Party (CCP), said construction of the bridge was completed on October 6. "As the last tank of cement was poured on Sunday, the construction of the Magufuli Bridge was completed by two Chinese companies in Tanzania's northwestern Mwanza region," the People's Daily said in an online post. "The Magufuli Bridge is the only extra-dosed cable-stayed bridge in the Lake Victoria region and the longest of its kind in Africa." The bridge will also become among the Top 10 longest bridges in Africa. The bridge connects Misungwi and Sengerema districts and provides a crucial link between Tanzania and neighbouring countries of Rwanda, Burundi and Ugabda 📽️ The People's Daily

Tanzania Business Insight

59,867 views • 1 year ago

Presidential Media Tour: 1,068km Sokoto -Badagry Superhighway Construction by the President of Nigeria Bola Ahmed Tinubu under APC Nigeria 1; this project was PROPOSED in 1978. -(a): 1979, President Shagari worked on it on PAPER. 2: From Obasanjo to Shagari to Tinubu, how many years guys? 46 years. 3: Therefore, the President Bola Ahmed Tinubu approved the project in 2024. -(a): the project is a 6-lane, concrete highway under the Renewed Hope Agenda. 4: Current Status: Construction is underway in sections: -(a): 258km Kebbi axis, 120km Sokoto Section, while 38km x 2 is managed by Dangote Group, 82km by Julius Berger, and 20x 2 km by BUA. -(b): Lovers of Hi-tech, read Nos 4(a) again for the breakdown of the companies involved as per $615 million loan. -(a): Construction project is concrete based and work has reached Gwandu. -(b): CCTV, cameras, solar street lighting will be installed. 5: The project was conceived to connect North West to South West. 6: Presidential team are here to inspect the project to see for themselves how far. BENEFITS: 7: The construction has created, and continues to generate, thousands of jobs with approximately 80% of the workforce comprising Nigerian professionals and local workers. -(a): Boosting income in rural areas. 8: the Highway connects agricultural hubs, making it easier to transport goods and stimulating commerce. 9: the Highway is designed to reduce travel time between Sokoto and Lagos from 13-17 hours to under 6-9 hours respectively. 10: Ogun state axis: 13km of rigid concrete pavement has been laid from the Agbara axis towards Lusada. Concrete pavement is visible in the Atan side. 11: First phases aimed for 2027 with full completion targeted before the President Bola Ahmed Tinubu leaves office Inshallah in 2031. Sunday Akin Dare, CON, FNIS The Toluwani Borokini Foundation THE TROJAN BEAST Temitope Ajayi Prince of both kingdoms Abdullahi A. Yakubu Alaka Tunde Debola J A OSARO tunderahman O'tega Ogra Daddy D.O🇳🇬 TallJohn🌍 Femi Adebayo Kebbi State Government Hon. Aminu Suleiman Senator Abubakar Atiku Bagudu CON JAKADAN KAURAN GWANDU KEBBI BLOG NGN LTD 🇳🇬 Dr. Nasir Idris Better Kaduna🌆 Boss Baby 🌚🌝 Anthony Mustapha M. M. A Austin Effiom Lagos Landlord & Osun, Kwara Tenant🇳🇬 🇺🇬 🇬🇭 Hon. Ọmọtọ́ńsọrẹ̀ fabulous Oduduwa’s 1st Born..⚔️🐆Omo Babayo Omotola 🇳🇬 Ọláńrewájú Ìdòwú jimmyking Alobo Sammy Desh Four Eyes Media

Woye

16,927 views • 3 months ago

Major milestone for #Telangana. The Government of Telangana has entered into an MoU with Sun Petrochemicals, a leading energy company to develop 3 Pumped Storage Hydro Power projects in Nagarkurnool, Mancherial, and Mulugu districts, totalling a massive 3,400 MW capacity. Alongside, integrated solar power plants (5,440 MW) will be developed, driving the state's green energy goals. The project comes with an estimated ₹45,500 crore investment, creating over 7,000 jobs during the construction phase. This is set to boost socio-economic growth, particularly in these regions. Hon’ble Chief Minister Shri Revanth Reddy garu welcomed the huge agreement, noting that Telangana’s investments soared at #Davos last year, the #TelanganaRising delegation had scored a great watermark agreement with this deal with #SunPetrochemicals. This deal continues that momentum in the renewable energy sector. “Telangana is broadening its investment base, creating massive job opportunities and transforming areas like Nagarkurnool, Mancherial, and Mulugu,” Chief Minister added. IT & Industries Minister Shri Minister Sridhar Babu garu highlighted the year-long efforts to secure this deal, noting it’s one of the largest investments since 2014. Shri Dilip Shanghvi, MD of Sun Pharma & Sun Petrochemicals, hailed Telangana as an "irresistible investment destination" under CM Shri Revanth Reddy's leadership, with green energy as a game-changer for the state's economy. Sridhar Babu Duddilla Jayesh Ranjan #WEF25 #Davos25 #InvestInTelangana

Telangana CMO

86,099 views • 1 year ago

🇮🇳India today 1. is a $4.15T economy 2. is the fastest-growing major economy 3. holds $700B+ in forex, 4th-largest 4. has ₹2.05L per-capita income 5. exports $863B in goods & services 6. ships $421B in services exports 7. is 3rd-largest by PPP, $18T+ 8. is set to be a top-3 economy soon 9. has the 4th-largest stock market 10. averages nearly ₹2L cr GST a month 11. files 9 crore+ tax returns a year 12. banks 55 crore via Jan Dhan 13. doubled its GDP in a decade 14. drives ~1/6 of global growth 15. sees record SIP inflows monthly 16. is the No.2 phone maker globally 17. makes 99% of its phones at home 18. exports ₹2.62L cr of smartphones 19. makes ₹13.11L cr of electronics 20. rolled out its first Made-in-India chips 21. is the 3rd-largest car market 22. leads in 2-wheelers & tractors 23. is the 2nd-largest steel maker 24. grew defence exports 34x in a decade 25. does 23.66B UPI txns a month 26. moved ₹29.88L cr on UPI in July 27. has 2.4L+ recognised startups 28. clears 763M UPI payments a day 29. runs UPI live in 7+ countries 30. is the 3rd-largest startup hub 31. has minted 100+ unicorns 32. made 23L+ jobs via startups 33. connects 900M+ to the internet 34. ranks 3rd in science papers 35. ranks 6th in patent filings 36. spends ₹12.2L cr on capex 37. has 99.6% rail electrification 38. rose to 38th on innovation index 39. ranks 4th in trademark filings 40. has 63.73L km of roads 41. has 1.47L km of highways 42. has 45,516 km of 4-lane roads 43. has 7,300+ km of expressways 44. has 165 operational airports 45. has the 2nd-largest road network 46. has the 4th-largest rail network 47. has 1,155+ km of metro rail 48. runs 160+ Vande Bharat trains 49. built the world's highest rail bridge 50. has 1,728 MMTPA port capacity 51. runs metro in 26 cities 52. grew its highway network 60% in a decade 53. has 552 GW of power capacity 54. more than doubled power since 2014 55. runs 300 GW of non-fossil power 56. is 3rd-largest in renewables 57. has 164 GW of solar power 58. added a record 55 GW of clean power in FY26 59. is 4th-largest in wind power 60. runs a Green Hydrogen Mission 61. has powered every village 62. targets 100 GW nuclear by 2047 63. grew renewable output to 478 billion units 64. grows 357.7 MT of foodgrain 65. grows 362 MT of horticulture 66. is the No.1 milk producer 67. leads in pulses, millets & spices 68. farms the most arable land 69. has 844 medical colleges 70. doubled its MBBS seats 71. enrols 4.3 cr in higher ed 72. keeps growing IITs and IIMs 73. has 1,100+ universities & 45,000+ colleges 74. runs the largest health cover 75. covers 55 crore under Ayushman 76. raised life expectancy past 70 77. is the 4th nation to dock in orbit 78. has 44 UNESCO heritage sites 79. hit the Moon's south pole first 80. is home to 1.46B people And we are just getting started. Happy Independence Day!

The Offline Network

134,361 views • 11 days ago

When Politics Denies Water: How the PTI-Initiated Chapri (Mianwali) Dam Water Supply Project Remains Stalled While 143,000 People Continue to Suffer: For generations, the people of the Khattak Belt in Tehsil Isa Khel, District Mianwali, have lived under the shadow of a severe and persistent drinking water crisis. The core Khattak Belt comprises the Union Councils of Tabi Sar, Tola Bangi Khel, Chapri, Kot Chandana, Sultan Khel and Wanjari. However, the wider area affected by this crisis and intended to benefit from Chapri Dam Water Supply Project extends across 87 villages&8 Union Councils, encompassing a population of approximately 143,752 people. Despite decades of promises, surveys, announcements&official acknowledgements of the problem, thousands of families continue to be deprived of reliable access to clean and safe drinking water. In many villages, residents remain dependent upon stagnant rainwater ponds& natural depressions, often shared by both humans&livestock. Women, children&elderly citizens are frequently forced to travel long distances under harsh weather conditions simply to collect water for their households. The same contaminated ponds serve as the only source of water for both people and animals. Situation is further aggravated by fact that groundwater lies at a depth of 800 feet and is often contaminated by harmful mineral deposits, rendering it unsuitable for human consumption. For countless families, access to safe drinking water remains a daily struggle rather than a basic right. What should be readily available in any modern society has become a constant source of hardship, anxiety and suffering. The consequences of this deprivation extend far beyond inconvenience. Unsafe water sources expose entire communities to waterborne diseases and serious health complications, undermine human dignity and place an enormous burden on already vulnerable households. Children grow up in conditions where access to clean water cannot be taken for granted, while women bear the disproportionate burden of securing water for their families. In a country where access to safe drinking water should be guaranteed, thousands of citizens continue to live in circumstances that no community should be forced to endure. Recognizing the gravity of this longstanding humanitarian crisis, the Pakistan Tehreek-e-Insaf (PTI) government led by former Prime Minister Imran Khan launched the Chapri Dam Water Supply Project in 2020 as a comprehensive and permanent solution to the chronic water shortage affecting the Khattak Belt and adjoining areas. The project was designed to deliver clean and safe drinking water to more than 143,000 residents through the construction of reservoirs, filtration facilities, transmission lines and an extensive distribution network supported by gravity-fed systems and solar-powered pumping stations. For the people of Isa Khel, this was far more than a development project. It represented hope, dignity and the prospect of finally ending a crisis that had persisted for generations. It was the first serious large-scale governmental initiative aimed at permanently resolving one of the most pressing humanitarian challenges facing the region. Following its launch, substantial progress was achieved and approximately Rs. 3.5 billion of public funds were invested in the project's execution. Significant portions of the infrastructure were completed, bringing the project within reach of transforming the lives of tens of thousands of residents. However, following the change in government, progress slowed dramatically and the project remains incomplete due to the non-release of the remaining funds required for its completion. Current PMLN Government in Punjab led by Maryam Nawaz wants to maintain status quo, they feel the project was introduced by Imran Khan and its completion will help PTI. Without realizing its 143,000 people suffering from non-availability of drinking water. This is pure political victimization.

Barrister Abuzar Salman Niazi

23,219 views • 2 months ago

Only Africa Can Save Europe Originating from COP28, the TeraMed project aims to generate 1 TW of solar energy in North Africa, creating around 3 million direct and indirect jobs. This would currently account for about 83% of the European Union's total installed electricity capacity, including renewables, fossil fuels, and nuclear (approximately 1.2 TW as of late 2025). If this target were raised from 1 TW to 1.5 TW, the European Union would more than double its current installed capacity of about 1.2 TW, reaching a total of roughly 2.7 TW, which would exceed twice the American capacity (around 1.3 TW) and near three-quarters of the Chinese capacity (around 3.8 TW). Based on TeraMed's estimates, it would require investments of $1 trillion, generating around 4.5 million jobs in North Africa and Europe. The installation project would take between 6-10 years, though it could be accelerated with aggressive engineering and strong political will. So far, in more than one year, TeraMed has not installed a single panel, highlighting the lack of coordination among Europeans in defining their energy, industrial, and economic policy priorities. With 1.5 TW of electricity generated, industrial costs in Europe would drop significantly, fulfilling the first stage to retain and attract industries. However, a second pillar would still need to be completed: natural gas. All current pipeline projects in Africa are timid, from Mauritania and Senegal to Mozambique. Investments of $20 billion and 20,000 km of pipelines would be required across several African countries, but primarily a robust Nigerian pipeline capable of transporting at least 70 bcm, which alone would meet 20% of Europe's demand. This is a project that would take at least 10 years, though it could be accelerated at the same pace as the solar panels. These are the reasons why the war must end, and Europe must get back on track. The cost of the war far exceeds the resources sent to Ukraine. Estimates suggest that total war-related costs, including aid to Ukraine, weapons, refugees, energy losses, and sanction impacts, exceed $1.5 trillion. For these and other reasons, I always say that warmongers are the true saboteurs of Europe. Moreover, engaging in free trade agreements like those with Mercosur or Indonesia won't help, as such high energy costs will make it difficult to compete in those markets as well. The Germans are desperately trying to offset losses with solar panels, but their efficiency is 2-3 times lower than panels installed in North Africa. Therefore, a supranational plan is needed. Installing panels alone won't solve the problem if they aren't efficient enough to restore industrial competitiveness and lower overall costs. Both investments in solar panels and gas would pay for themselves in just a few years, repositioning Europe to compete in the global market, and more than that, luring back companies that have already migrated to Asia. It’s green, industrial, and economic, and it generates both local and foreign jobs, bringing development and opportunities to these countries, just as the Chinese are doing in some countries.

Patricia Marins

25,302 views • 9 months ago

As promised by the Hon'ble Prime Minister Narendra Modi in the run up to the just concluded Assembly Elections, works on cleaning of Yamuna have already begun in the right earnest, with trash skimmers, weed harvesters & a dredge utility craft already starting cleaning operations in the river today. Hon'ble Delhi LG VK Saxena LG Delhi yesterday met the Chief Secretary and ACS (I&FC) and asked them to start work immediately. At the outset a four pronged strategy has put in place to tackle the issue comprehensively. 1. To begin with, the trash, garbage and silt in the Yamuna river stream will be removed. 2. Simultaneously cleaning operations in the Najafgarh Drain, Supplementary Drain and all other major drains will start. 3. At the same time, a daily watch on the existing STPs in terms of their capacity and output will be maintained, and 4. A time bound plan in terms of construction of new STPs/DSTPs on drains etc to meet the actual shortfall of treating about 400 MGD of sewer will be put in place and operationalized. The execution of this ambitious plan that targets cleaning the river in about 3 years, will require seamless coordination between various agencies and departments that include DJB, I&FC, MCD, Environment Department, PWD and DDA. Monitoring of the abovementioned works will be done at the highest level on a weekly basis. In addition to this, the Delhi Pollution Control Committee (DPCC) has been directed to keep strict vigil on discharge of untreated effluent into the drains by Industrial Units in the City. It may be noted that the rejuvenation of Yamuna had started in mission mode in January 2023, when the NGT had constituted a High Level Committee (HLC) under the Chairmanship of Hon'ble LG V.K Saxena. However, after 5 monthly meetings of the said HLC which was closely monitoring cleaning operations, the then AAP Government under Arvind Kejriwal moved the Supreme Court and got the NGT order stayed by the then CJI Chandrachud on 10.07.23. Thereafter, works of Yamuna Rejuvenation had again been stalled and CoD/BoD levels that had started improving slightly on a month on month basis, became worse with pollution reaching record levels early this year. *DUC shifted near the signature bridge and is going to float towards Vasudev ghat *Trash Skimmer has started working at Vasudev Ghat *Weed harvester near Signature Bridge Another weed harvester machine has started working at ITO.

Lok Niwas Delhi 🇮🇳

83,558 views • 1 year ago