
The Boring Company
@boringcompany • 1,139,284 subscribers
Beat the snail
Shorts
Videos

See how Prufrock continuously mines - pushing and building at the same time. The machines, from Las Vegas to Dubai, are remotely controlled from our Bastrop Operations Center. These advances help TBC deliver more miles each year in the battle against soul-destroying traffic.
The Boring Company20,462,631 次观看 • 15 天前

TBC and RTA have signed a contract to construct Dubai Loop. TBC would like to thank The Crown Prince of Dubai Hamdan bin Mohammed and His Excellency Mattar Al Tayer and his team. The pilot system with 6.4 km of tunnel and 4 stations will begin construction in late 2026.
The Boring Company9,224,593 次观看 • 4 个月前

Big tunneling milestone! For the first time, TBC has continuously mined in a Zero-People-in-Tunnel (ZPIT) configuration. There is nobody in the machine (besides the videographer), which is simultaneously advancing forward and erecting a ring (i.e. building the tunnel). Each full ring weighs ~24,000 pounds. In the same way that full and rapid reusability is the holy grail for rockets, ZPIT continuous mining is the holy grail for Boring Machines. This is the safest, fastest, and least expensive architecture to build tunnels.
The Boring Company19,566,971 次观看 • 1 年前

Prufrock-4 is our smartest, fastest and safest Tunnel Boring Machine. And the next iterations (5, 6, and 7) are already being built at The Boring Factory in Texas. Goal is Continuous Mining and Zero-People-in-Tunnel (ZPIT). We are hiring exceptional ME, EE, and SWEs - join us!
The Boring Company9,256,872 次观看 • 8 个月前

Announcing Music City Loop! The Boring Company is coming to the State of Tennessee. Las Vegas Loop has already moved more than 3M passengers, and growing. Next stop, Nashville! Thanks to the Tennessee Department of Transportation myTDOT, Governor Bill Lee Gov. Bill Lee, The Metro Nashville Airport Authority Fly Nashville, The Music City Convention Center Music City Center, and The Nashville Chamber of Commerce Nashville Area Chamber of Commerce for their partnership in helping TBC bring innovative transportation solutions to Nashville.
The Boring Company1,746,690 次观看 • 10 个月前

Prufrock-3 is ready to dig its 5th tunnel! In advance, the Monster passed its final tests, tilting the 480,000 lb shells ±10°. Prufrock-3 will then tilt down and mine directly into the ground - no concrete, no pit, zero civil prep. Allows rapid, safe and inexpensive launch.
The Boring Company364,673 次观看 • 5 个月前

Prufrock-MB1 is ready to mine in Nashville! MB1 commissioning is complete, including the brief 11 rpm rotation shown here. Once all permits/approvals are in hand, we launch. Next focus: shipping and commissioning Prufrock-MB2, which is currently being built in Bastrop.
The Boring Company271,364 次观看 • 4 个月前




