Sahil P's banner
Sahil P's profile picture

Sahil P

@Sahilinfra2 • 40,453 subscribers

Infra enthusiast.Optimist

Shorts

Kharghar-Turbhe link road 5.49 km Kharghar-Turbhe tunnel project, with twin 1.8 km tunnels. Never made the news i guess but the tunnels made breakthrough last week.Vadiuct work on both sides are u/c though. 📹Karthik Rallabandy

Kharghar-Turbhe link road 5.49 km Kharghar-Turbhe tunnel project, with twin 1.8 km tunnels. Never made the news i guess but the tunnels made breakthrough last week.Vadiuct work on both sides are u/c though. 📹Karthik Rallabandy

41,233 просмотров

5.15 kms Porvorim bypass flyover,Goa on NH66 opens today. One of those rare times when the project is completed on time 😋 📹TANMAY FALDESSAI

5.15 kms Porvorim bypass flyover,Goa on NH66 opens today. One of those rare times when the project is completed on time 😋 📹TANMAY FALDESSAI

23,401 просмотров

Mumbaimetro L4 1)Good to see Platform screen doors installation started on phase 1 stations 2)3)Temporary inspection pit post Gaimukh stn till the depot gets ready 📷Asrar Ahmad Shahi

Mumbaimetro L4 1)Good to see Platform screen doors installation started on phase 1 stations 2)3)Temporary inspection pit post Gaimukh stn till the depot gets ready 📷Asrar Ahmad Shahi

20,173 просмотров

TATA Electric Prima's on the road run by BillionE Mobility. Changing short distance heavy hauling one load at a time. These are perfect for hauling steel loads from factory to nearest wholesale market 📷 ABIN S.r

TATA Electric Prima's on the road run by BillionE Mobility. Changing short distance heavy hauling one load at a time. These are perfect for hauling steel loads from factory to nearest wholesale market 📷 ABIN S.r

12,911 просмотров

Karad flyover (3.47 kms) on Satara-Kolhapur highway. Satara to kolhapur side lane is opened for for light vehicles.Both sides are ready but minor works remains,other side too wil opened in next few days. The old smaller flyover was demolished in early 2023 📹 Karadtoday

Karad flyover (3.47 kms) on Satara-Kolhapur highway. Satara to kolhapur side lane is opened for for light vehicles.Both sides are ready but minor works remains,other side too wil opened in next few days. The old smaller flyover was demolished in early 2023 📹 Karadtoday

22,823 просмотров

Mumbai coastal road. Coastal road's connection to Bandra worli sea link.1st of steel girder placed 🎥pawan padiyar

Mumbai coastal road. Coastal road's connection to Bandra worli sea link.1st of steel girder placed 🎥pawan padiyar

50,752 просмотров

Mumbaimetro L2b Shivaji chowk station. Phase1 ready to open. They are looking at mid November opening 📹 Qayyum khan

Mumbaimetro L2b Shivaji chowk station. Phase1 ready to open. They are looking at mid November opening 📹 Qayyum khan

22,319 просмотров

Some social organization alongwith BMC was cleaning the hell out of link road in Andheri today morning from JVPD to Infiniti mall.Gave a thumbs up to everybody and appreciated them for their efforts

Some social organization alongwith BMC was cleaning the hell out of link road in Andheri today morning from JVPD to Infiniti mall.Gave a thumbs up to everybody and appreciated them for their efforts

15,797 просмотров

Videos

Sahilinfra2's profile picture

Mumbaimetro L9 CMRS inspection early morning yesterday 📷Kittu Babu

Sahil P

27,372 просмотров • 9 месяцев назад