
Relativity Space
@relativityspace • 127,797 subscribers
Building reusable rockets to empower science, exploration, and innovation beyond our planet.
Shorts
Videos

We're going to conduct science at Mars.🔴 Yesterday we announced the Interplanetary Sciences Program. Today, let’s take a closer look at the ground-breaking technology we're developing and launching to the Red Planet: 📡 A shallow radar sounder built by us to map subsurface ice and geology, revealing climate and geologic history, habitability conditions, and high-value landing sites 🖥️A Relay Data Center built by us to deliver networked optical and RF communication, run advanced algorithms and AI models, support autonomous responsive science operations, and return massive data volumes to Earth. 🔬 An atmospheric profiling suite built by NASA Ames to measure winds, temperatures, clouds, dust and planetary energy balance.
Relativity Space77,649 Aufrufe • vor 1 Monat

Terran R hardware is moving from build to integrated test, with stage 1 qualification testing underway and flight hardware continuing to advance. ✓ Stage 1 integration advanced with stringer and doubler drill operations, stringer joiner installation, and raceway bracket drilling ✓ Thrust structure fluids builds progressed ahead of avionics testing and leak checks ✓ All vehicle structures and closeouts completed on the stage 1 qualification article, officially transitioning from manufacturing to factory test.
Relativity Space15,068 Aufrufe • vor 5 Tagen

The Terran R program entered a new phase in May as stage 2 rolled out of Long Beach and began its journey to NASA Stennis. 🏗️ Build: Completed stage 2 integration while advancing thrust structure, interstage, and stage 1 qualification hardware. 🔥 Test: Aeon V second stage engine completed its qualification campaign, hitting key service life, duration, and start milestones for flight one. 🌴Launch: Water tower reached its final height at 305 feet; lightning protection system erection continued
Relativity Space79,094 Aufrufe • vor 1 Monat

LC-16 is continuing its transition from construction to activation, with major infrastructure and ground systems work advancing across the site. ✓ Water tower reached its final height of 305 feet ✓ Lightning protection system erection continues across the site ✓ 220,000-pound bridge crane installed in the HIF cleanroom ✓ HIF outfitting underway with ductwork, offices, and facility systems progressing ✓ Launch table and transporter-erector infrastructure continue advancing
Relativity Space28,460 Aufrufe • vor 1 Monat

📣 Aeon R Mission Duty Cycle complete!!! Last night Stennis Space Center #AeonR burned in a flight-like configuration for 143 seconds at 70% power – marking a record-breaking pace for engine development and a very speedy 48-hour turnaround from Aeon R's first ever hot fires to successfully completing a full flight duration burn. < 2 days Aeon Rs first hot fires ➡️ Full MDC < 3 months ➡️ Powerpack install, testing, conversion to full engine, hot fires < 1 year empty land ➡️ dual-bay vertical engine test stand ≤ 2 years ➡️ 1,000+ Aeon R component level tests
Relativity Space355,693 Aufrufe • vor 2 Jahren

Fired up our first Aeon R engine hot fires this week. Sound on. 🎯 10 seconds of fire. ✔️ Validated component harmony during start up, at target power (70%), and shutdown. 🏅️ Strong start to test campaign. Initial hardware inspections look healthy. 🔜 Longer duration. More power. More blue fire. 📍Stennis Space Center R Complex, new dual-bay vertical engine test stand
Relativity Space263,756 Aufrufe • vor 2 Jahren

From engine qualification to advancing stand readiness, teams are preparing for a busy season of Terran R testing. 📍NASA Stennis, MS ✔️ Aeon V second stage engine qualification campaign completed ✔️ Aeon R first stage engine acceptance testing continues ✔️ Initial startup of the environmental control system completed ✔️ LOX flush performed on the A2 top deck ✔️ Over 11,000 welds completed on A2
Relativity Space14,619 Aufrufe • vor 1 Monat

Across the factory, teams advanced major Terran R structures, from stage 2 integration and shipment to propulsion, thrust structure, interstage, and stage 1 qualification hardware. ✓ Shipped stage 2 from Long Beach to NASA Stennis ✓ Installed outer engine LOX and fuel feedlines on the thrust structure ✓ Advancing stage 1 qualification article ahead of test ✓ Progressed interstage barrels through mechanical assembly and machining
Relativity Space13,264 Aufrufe • vor 1 Monat

Terran R build is continuing to ramp up this fall. From avionic builds to expanding of our machine shop capabilities and more. 🔥In prop, teams completed assembly of the second Aeon R engine for first flight and reduced average cycle times across key engine components by 50%. 💻The avionics team is building the flight hub box, which will serve as Terran R’s central node for routing data and distributing power to critical systems. 🚀Welding of the first stage tank is progressing with 3 circumferential friction stir welds now complete.
Relativity Space53,678 Aufrufe • vor 9 Monaten

Terran R integration is accelerating across flight hardware and factory infrastructure. ✓ Stage two avionics trays, boxes, harnesses, valves, and raceways installed ✓ Low-voltage checkouts began, integrating avionics hardware with flight software ✓ All first stage Aeon R flight engines for flight one have been manufactured, assembled, and shipped ✓ Stage one qualification article welding is complete ✓ In-house battery production ramping, with units progressing through flight build and acceptance testing
Relativity Space15,590 Aufrufe • vor 2 Monaten

On the factory floor, Terran R vehicle integration continues to advance. ✅ Second stage harnesses and raceway covers built. ✅ COPV leak test completed and common dome baffle installation underway. ✅ First stage tank integration progressing with weld buy-offs, instrumentation bracket installs, and machining. ✅ Aeon V and Aeon R engines manufactured, assembled, and shipped.
Relativity Space24,231 Aufrufe • vor 4 Monaten

Terran R Build Progress – The past 2 months have been packed with rapid advancements across design, manufacturing, and testing. From welded barrels to hot fires, checkout some of the highlights on the path to first flight. 🚀 In Long Beach: Completed the first circumferential friction stir weld for flight hardware, joining the stage 2 common dome to the stage 2 LOX barrel. 🔥 Over at Stennis Space Center hot fire testing continues with thrust vector control (TVC) motion up to 5.5 degrees, the maximum range of the stand! 🏗️ At LC-16 in Cape Canaveral, Florida, the first steel columns for Terran R’s horizontal integration facility were erected. 👉
Relativity Space60,464 Aufrufe • vor 1 Jahr

December capped off a year of rapid Terran R progress across design, build, test and launch – setting the stage for a defining year ahead. 🏗️ Build: Hardware advanced across tanks, interstage, thrust structure, and propulsion, with work already underway beyond first flight. 🔥Test: Six engines on-site at Stennis Space Center in a single day, as simultaneous acceptance and development test campaigns accelerated. 🌴Launch: At LC-16, construction shifted toward facility outfitting and launch operations planning.
Relativity Space30,379 Aufrufe • vor 6 Monaten

Terran R moved closer to flight readiness in April with key integration, test, and launch infrastructure milestones. 🏗️ Build: Stage two integration advanced with avionics, harnesses, valves, and raceways installed. All first stage Aeon R engines for flight one have been manufactured, assembled, and shipped. 🔥 Test: Teams began software run-for-record testing on the completed stage two HITL build, while Aeon V reached key service life milestones during full-duration mission duty cycles. 🌴 Launch: At LC-16, the water tower and lightning protection systems rose as launch site activation work continued across the LOX farm, water systems, and more.
Relativity Space13,495 Aufrufe • vor 2 Monaten

Test campaigns and infrastructure are scaling alongside hardware production. 📍 Stennis Space Center ✔️ Aeon V second stage engine testing, including a 526.5-second endurance demonstration ✔️ Aeon R first stage engine acceptance testing continues ✔️ Hangar roof structure completed with sheeting installation underway ✔️ Live ring lift installation complete ✔️ Fluid lines being machined and routed ✔️ Flume work progressing with new service platforms delivered
Relativity Space17,353 Aufrufe • vor 3 Monaten