Loading video...
Video Failed to Load
#Cabinet approves two major infrastructure projects for #Varanasi: - The development of a 43.218 km-long 6/4-lane Elevated Corridor connecting NH-31 and the Varanasi Ring Road along the Varuna River bank at a total cost of Rs. 10,998.32 crore - The development of a 46.039 km-long 6-lane Greenfield Elevated Corridor... show more
0 Comments
No comments available
Comments from the original post will appear here

