正在加载视频...

视频加载失败

Corridor-based approach for road infra development will ensure consistent standards, user convenience and logistics efficiency. #CabinetDecision

44,700 次观看 • 2 年前 •via X (Twitter)

10 条评论

Raul Vinci 🚩 的头像
Raul Vinci 🚩2 年前

काम किसी भी विभाग का हो , रील तो रील मंत्रालय से ही आयेगी !!

Ex Bhakt 的头像
Ex Bhakt2 年前

Thank you for Reel

তন্ময় l T͞anmoy l 的头像
তন্ময় l T͞anmoy l2 年前

Are road transport Minister ? Talk about Railways.

Sovik Das 的头像
Sovik Das2 年前

You are free to do all other work of every other ministries apart from railway which is assigned to you . When it comes to railway only work you does that is REEL making .

Monika Singh 的头像
Monika Singh2 年前

Reel Mantri ki Jay ho 🙏🙏

👑Che_ಕೃಷ್ಣ🇮🇳💛❤️ 的头像
👑Che_ಕೃಷ್ಣ🇮🇳💛❤️2 年前

First take care of your rail ministry and later you can talk about roads

Aniruddha Sarkar 的头像
Aniruddha Sarkar2 年前

Railway Mai Jo hadsa huya hai usko chupane kaliye reel mantri ne idhar udhar se a66a post lekar post karta hai,q ki reel mantri ka gaddi na chut jai

Champak Dash 的头像
Champak Dash2 年前

If 🚆 accident an Olympics sport

Aditya Kumar Trivedi 的头像
Aditya Kumar Trivedi2 年前

🚨 Vande Metro trail run conducted in Tamil Nadu.

Praween Kumar🇮🇳 的头像
Praween Kumar🇮🇳2 年前

माननीय रील मंत्री जी।

相关视频

NLC starts work on Dedicated Freight Corridor & Multimodal Logistics Park, Pipri 🇵🇰 Due to absence of rail-based freight transportation system at Karachi Port, congestion of containers has become a routine problem resulting in slow cargo movement & negative impact on economic activities. Heavy road traffic has also led to increased environmental pollution & damage to road infrastructure. The construction of Dedicated Freight Corridor and Multimodal Logistics Park at Pipri offers a long-term solution to these challenges. Ground breaking ceremony of Dedicated Freight Corridor was held with Federal Minister for Railways Hanif Abbasi and Group Chairman and CEO DP World, Sultan Ahmed bin Sulayem attending as chief guests. NLC will complete the project in multiple phases with USD 400 million Foreign Direct Investment. The first phase is scheduled for completion within four months. The project includes rehabilitation of a 52-kilometer railway corridor from Karachi Port to Pipri Marshalling Yard along with development of a modern Multimodal Logistics Park. It is aligned with the China–Pakistan Economic Corridor (CPEC) and Pakistan Railways’ ML-1 Project. Upon completion, import containers will be transported directly by rail from Karachi Port to Pipri and onward to destinations across Pakistan, China, Central Asia and other regional countries. The project is expected to significantly reduce container congestion at Karachi Port, streamline cargo movement, accelerate economic activity and bring marked improvements in traffic management and environmental conditions.

Pakistan Strategic Forum

12,211 次观看 • 7 个月前

Major Project Update: Thane Coastal Road hits fast forward In just eight months since construction began, Thane Coastal Road-1 has crossed a major milestone, with over 50% of the foundation work for the elevated viaduct now complete and pier cap and I-girder erection progressing rapidly. 👉 The 13.45 km, six-lane, access-controlled greenfield corridor is being built using cutting-edge engineering. For the first time in India, a greenfield road project is using a single-pile, single-pier system with monopile foundations on land. 👉 Designed as a strategic freight corridor, the project will decongest Ghodbunder Road and improve connectivity between NH-160 (Mumbai–Nashik Highway) and Gaimukh along the Thane Creek coastline, with major stretches on viaducts and bridges to safeguard the sensitive mangrove ecosystem. 👉 At Gaimukh, the road will directly connect with the upcoming Gaimukh–Fountain Hotel Tunnel, enabling seamless Thane–Bhayander connectivity. Together, these projects will significantly decongest Ghodbunder Road, transform urban mobility in Thane, and strengthen freight movement towards Wadhawan Port, JNPT, South Maharashtra, and Karnataka. 👉 The corridor will also integrate with key future infrastructure projects including the Thane Ring Metro, Thane Coastal Road-2, the Saket–Amane Elevated Corridor, and the Kasarvadavali–Kharbhav Road, cementing its role as a critical backbone of the region’s next-generation transport network. #ThaneCoastalRoad #MMRDA #InfrastructureIndia #ReimaginingMMR #TransformingMMR #UrbanMobility #BuildingTheFuture #MumbaiMetropolitanRegion #MegaProjects #Maharashtra #TransportInfrastructure #FastForward CMO Maharashtra Devendra Fadnavis Eknath Shinde - एकनाथ शिंदे Dr. Sanjay Mukherjee MAHARASHTRA DGIPR PIB India Infra News India (INI) Indian Tech & Infra Thane Municipal Corporation - ठाणे महानगरपालिका

MMRDA

26,177 次观看 • 6 个月前