Загрузка видео...

Не удалось загрузить видео

На главную

EXCLUSIVE: Drone shot showing how illegal structures were built on drainage channels and setbacks along Gedegede-Mobil road-Ikota, blocking the canals and thereby causing flooding in Lekki Phase II.

238,273 просмотров • 2 лет назад •via X (Twitter)

Комментарии: 0

Нет доступных комментариев

Здесь появятся комментарии из оригинального поста

Похожие видео

Earlier today, I led an extensive inspection tour of critical drainage infrastructure and flood mitigation projects across Lekki, Agungi, Ikota and Ajiran, and what we uncovered demands immediate and decisive action. The persistent flooding in Agungi despite the completion of major drainage infrastructure over two years ago has a clear cause. At Ajiran, we discovered that a land owning family deliberately blocked the outfall channel that was specifically designed to discharge stormwater by gravity into the Lagos Lagoon. I have directed that the outlet be reopened immediately in the overriding public interest. Let me state clearly: no individual or family has the right to obstruct natural watercourses or public drainage infrastructure regardless of their land titles. We are not taking anyone's land. We are simply restoring the channel to allow water to flow freely and protect thousands of residents from avoidable flooding. At Megamond Estate in Ikota, we found that developers had illegally reclaimed part of the Ikota River and commenced construction without obtaining the necessary environmental and drainage approvals. Enforcement and abatement notices had been served previously but were ignored. From tomorrow morning, all illegal structures erected on reclaimed drainage alignments without approval in that estate will be removed. This action sends a clear message that Lagos will not tolerate encroachment on drainage channels or public infrastructure. I also reiterate that any development involving wetlands or water related projects must obtain an Environmental Impact Assessment and Wetland Clearance from the Ministry before any reclamation or construction begins. We do not care whose ox is gored. It is unfair to law abiding residents and unacceptable because it compromises public safety. I urge every Lagosian to remain vigilant. The illegal activities we uncovered today came to our attention through whistleblowers. We investigated, verified, and acted. See something, say something - constructively. We are fully committed to a #CleanerLagos and a #GreaterLagos.

Tokunbo Wahab

139,049 просмотров • 25 дней назад

Today’s heavy rainfall put to test our drainage systems in Kampala, and the results are encouraging, although we have not yet achieved our target level of resilience. Areas including Sebana Road, Clock Tower,forest mall, golf course and Allen Road experienced flash floods, but in most of them the water cleared within about seven minutes, compared to past incidents where flooding would last for hours or days and disrupt businesses immensly. This improvement follows recent Kampala Capital City Authority (KCCA) drainage upgrades, including the construction of 16 crossing culverts along Allen Road and Sebana Road into Nakivubo Channel has increased the city’s capacity to tame storm water. Additional works are ongoing, including longitudinal drainage along Ben Kiwanuka Street and a planned box culvert on Namirembe Road under the Greater Kampala Metropolitan Area Urban Development Project. Two buildings, Totala Business and Qualicell, experienced basement flooding due to drainage challenges internal to them, and the KCCA drainage team has been quickly deployed with suction trucks to support them evacuate the water. As drainage improvement works continue, inconvenience caused by this natural occurrence is regreted. Our call on residents, traders & building owners is to dispose of waste responsibly and avoid blocking drainage channels. Kampala Capital City Authority (KCCA) is working to build a cleaner, safer, and more flood-resilient Kampala.

Hajjat Sharifah Buzeki

71,491 просмотров • 4 месяцев назад