FIX IT ON SCREEN: 1X COST. FIX IT DURING CONSTRUCTION: 10X. FIX IT AFTER HANDOVER: 100X.
Solvaix
Visit on X1.6K followers
18,909 views
FIX IT ON SCREEN: 1X COST. FIX IT DURING CONSTRUCTION: 10X. FIX IT AFTER HANDOVER: 100X.
That's the industry's own math for coordination errors. Every pipe and duct on this ceiling carries its own millimeter callout, checked against the real unfinished site before drywall closes over it.
One documented BIM coordination case spent $200,000 catching clashes like this before construction. Saved over $2.5 million once the project finished. A 10x return.
Revit's new MCP integration puts Claude directly on a model like this, every dimension, every parameter, every clearance, without the manual scroll. It still can't move anything in the file, only point at what's about to go wrong.
See the article below for exactly where that line is drawn, and why.