正在加载视频...

视频加载失败

*🌧️ Heavy rains. Uninterrupted 🚆 operations.* Despite heavy rainfall, Western Railway’s comprehensive monsoon preparedness is ensuring smooth, uninterrupted, and normal train services across the network. DRM - Mumbai Central, WR | Ministry of Railways #WesternRailway #MumbaiRains #MonsoonPreparedness #KeepingMumbaiMoving #MumbaiLocal #Monsoon2026

19,034 次观看 • 3 个月前 •via X (Twitter)

0 条评论

暂无评论

原始帖子的评论将显示在这里

相关视频

TELANGANA - The Powerhouse of the Monsoon. While extreme monsoon rains are typically associated with the Western Ghats and the North East, Telangana has increasingly emerged become a new center for extreme monsoon rains, witnessing some of its most intense and frequent downpours in the last ten years. Central Telangana was drenched with 300–420 mm of rain within 24 hours, just two days ago, under the influence of The increasing occurrence of these extreme rainfall events indicates a strengthening monsoon pattern, contributing to recurrent flooding and surface inundation across the state.. Back in 2024, Telangana also faced extreme rainfall Kakarvai in Khammam logged 520 mm and Nellikudur in Mahabubabad saw 460 mm on September 1, while the usually arid Kodad was drenched with 344.8 mm just a day earlier. In July 2023, a low-pressure system (BB5) over the Bay of Bengal brought devastating rains to Telangana. Lakshmidevipeta in Mulugu district recorded an astounding 649.8 mm in 24 hours, while Chityal in Jayashankar Bhupalpally saw 610 mm on the same day. Across the state, over 70 locations reported extreme rainfall with 18 places above 300 mm and another 35 above 200 mm. The 2022 monsoon will be remembered for the historic Godavari floods, the river at Bhadrachalam swelled to 71.3 feet, releasing 24,43,000 Cusecs after days of relentless rain over Maharashtra and Telangana. Even usually dry Nalgonda saw an unprecedented 192 mm on July 23, while Khanapur (Nirmal) recorded 290 mm on July 14, during a week of intense rainfall across the state. 2021 - A low-pressure area over the Bay of Bengal in early September 2021 brought exceptionally heavy rainfall to Telangana, resulting in flooding across several districts. The IMD reported 390 mm at Nadikuda (Warangal) in 24 hours ending 7 September, with significant totals of 310 mm at Malliala, 290 mm at Bornapalli, 260 mm at Warangal, and 250 mm at Karimnagar. The overall state rainfall was approximately 30% above normal for the period. The 2020 monsoon stands out for the historic Hyderabad floods, when the city was battered by unprecedented rains in mid-October. On October 14th, rainfall crossed 200 mm across many parts of the city Himayatnagar (298.8 mm), Charminar (245 mm), Bandlaguda (242 mm), and the SR Campus gauge reported an exceptional 311 mm. Across Telangana, the season’s rainfall was 46% above normal. Even before the recent extremes, Telangana had witnessed above-normal monsoon years. In 2019, the state averaged 1,018.2 mm of rainfall against a normal of 938.8 mm, while in 2016, the average reached 1,032 mm, about 10% higher than the state’s long-term mean of ~939 mm. Back in 2013, parts of northern Telangana witnessed exceptional monsoon rains Wazeedu (Mulugu) recorded 517.5 mm on July 19, and Dahegaon in Kumuram Bheem Asifabad dist logged 503.6 mm on July 23. The forested regions of Tadwai, Venkatapuram, and Wazeedu remain particularly vulnerable to extreme rainfall events. The increasing occurrence of these extreme rainfall events indicates a strengthening monsoon pattern, contributing to recurrent flooding and surface inundation across the state. Video from Warangal city.

Naveen Reddy

24,470 次观看 • 11 个月前

🌧️The Mumbai Metropolitan City (Mumbai City & Suburbs) has experienced extremely heavy rainfall over the past two days. In certain locations, an unprecedented volume of rainfall exceeding 350 millimetres was recorded within a short duration. ☔️In light of the prevailing weather conditions, all departments of the Brihanmumbai Municipal Corporation (BMC) were actively and continuously engaged in on-ground operations. Officers, engineers, pump operators, health workers, other staff and emergency response teams remained deployed on-field with utmost dedication and promptness. 🔹Special attention was given to critical work such as the storm water drainage system, sewerage network and pumping stations. Immediate and necessary measures were undertaken to ensure that the drainage of rainwater remained unhindered and that public inconvenience was minimised. 🌧️Due to the exceptional nature of the rainfall, citizens did face inconvenience at a few locations. However, Mumbaikars showed commendable civic discipline, understanding and extended their full cooperation by responding positively to the advisories issued by the administration from time to time. 🙏The BMC expresses sincere gratitude to the citizens of Mumbai for their support and cooperation. #mybmcupdates #MumbaiRains CMO Maharashtra Eknath Shinde - एकनाथ शिंदे Ajit Pawar Adv. Ashish Shelar - ॲड. आशिष शेलार Mangal Prabhat Lodha

माझी Mumbai, आपली BMC

57,385 次观看 • 1 年前

Sewri-Worli Elevated Connector: Transforming Mumbai’s Connectivity! Mumbai’s traffic dynamics are set to change with the Sewri-Worli Elevated Connector, a crucial part of MMRDA’s traffic dispersal system for Atal Setu. This 4.5 km, 4-lane elevated corridor will directly link Atal Setu to Bandra-Worli Sea Link and the Mumbai Coastal Road project, creating a seamless travel experience across the city. 🔹 Enhanced Connectivity: Navi Mumbai commuters heading to Central & South Mumbai *and western suburbs* will benefit from a signal-free, time-saving route. 🔹Traffic : Expected to add about 15-20% vehicular traffic from Bandra-worli and Mumbai Coastal road to Atal Setu, increasing the toll revenue on Atal Setu. 🔹 Engineering Feat: A double-decker Road Over Bridge (ROB) at Prabhadevi Station, crossing both Central & Western Railway lines, *will be constructed* using an advanced Push-Pull method for maximum safety. ✅ Current Progress: 60% work completed. Key Challenge: Assembling & erecting a 3000 MT heavy steel superstructure over railway tracks while ensuring commuter safety. This ambitious project is not just about infrastructure—it’s about connecting lives, reducing commute times, and making Mumbai’s transport network more efficient than ever! Dr. Sanjay Mukherjee #SewriWorliConnector #AtalSetu #MumbaiInfrastructure #SeamlessTravel #MMRDA #MumbaiTrafficSolutions #MMRDA50 #CelebrationOfDevelopment #RebootingMumbai #ReshapingMMR #MMRDA #AtalSetu #MTHL #Mumbai #MetroRegion #EfficientConnectivity #EcoFriendlyTransport #TransformingMumbai #MumbaiInMinutes

MMRDA

19,615 次观看 • 1 年前

MMRDA Begins Resurfacing Works on Atal Setu for Enhanced Durability & Riding Comfort The Mumbai Metropolitan Region Development Authority (MMRDA) has initiated comprehensive resurfacing and pavement restoration works on the Atal Setu, ensuring long-term strength and superior riding comfort for commuters. To avoid complete closure of the bridge, the work is being carried out in phases. The third and fourth lanes will be resurfaced first, and once completed, the remaining two lanes will be taken up. After observing pavement distress in certain localised stretches on the Navi Mumbai–bound carriageway, starting at the 10.4 km mark, mainly on the outer heavy-vehicle lanes, MMRDA conducted a detailed technical review. Temporary rectification using mastic asphalt was carried out during the monsoon to maintain smooth traffic flow and ensure commuter safety. Now that the monsoon has subsided, full-fledged resurfacing operations have commenced. The works are being executed under the expert guidance of IIT Bombay, covering every stage — from material selection and mix design to plant-level and on-site quality control. Since the project is still under the defect liability period, the entire cost will be borne by the contractor. MMRDA remains committed to maintaining world-class standards of quality, safety, and durability on the Atal Setu — ensuring a safe, seamless, and smooth driving experience on India’s longest sea bridge. We thank all commuters for their cooperation and regret the inconvenience caused during the resurfacing works. #TransformingMMR #RebootingMumbai #ReshapingMMR #MumbaiInMinutes #MMRDA #MMRDA50 #ViksitMumbai4ViksitBharat #FutureReadyMumbai #RebootReshapeReconnect #MumbaiInfrastructure #InvestInMMR #MMRProgress #BuildingTheFuture #SmartInfrastructure #UrbanTransformation #VisionMMR Devendra Fadnavis Eknath Shinde - एकनाथ शिंदे Dr. Sanjay Mukherjee PIB in Maharashtra 🇮🇳

MMRDA

541,106 次观看 • 10 个月前

Creating Opportunities via Dedicated Freight Corridors! Glad to attend the dedication of the Western Dedicated Freight Corridor and the flagging off of 4 freight trains at the hands of Hon PM Narendra Modi Ji (Online) along with Hon Governor Jishnu Dev Varma ji. The 4 new freight train services on the Western Dedicated Freight Corridor include New JNPT (Mumbai), New Sanand, New Makarpura and New Umbergaon. Under the visionary leadership of Hon PM Narendra Modi Ji, the Western Dedicated Freight Corridor project gained significant momentum after 2014. Developed at a cost of ₹1.24 lakh crore, the corridor is a transformative project connecting North India with the western coast. Spanning approximately 1500 km across five states, it will enable faster and more efficient movement of goods, giving a major boost to India’s trade, industry and economic growth. Designed to facilitate double-stack container movement, the corridor will improve connectivity between Maharashtra and other states and further establish the state as a major logistics and maritime hub. With JNPT and the upcoming Vadhvan Port, Maharashtra is poised to enhance its maritime infrastructure, expand its presence in India’s growing maritime economy. Hon Union Minister Ashwini Vaishnaw ji, DCM Eknath Shinde ji, DCM Sunetratai Pawar, Minister Bharat Gogawale, Minister Adititai Tatkare, Consul General of Japan Ms Sato Hitomi and other dignitaries were present. Narendra Modi Governor of Maharashtra Ashwini Vaishnaw Eknath Shinde - एकनाथ शिंदे Sunetra Ajit Pawar Bharatsheth Gogawale Aditi S Tatkare Mahesh Baldi Prashant Thakur Dilip Walse Patil Consulate-General of Japan in Mumbai Ministry of Railways जवाहरलाल नेहरू पत्तन प्राधिकरण (JNPA) #Maharashtra #Namo4ViksitBharat #FreightCorridor

Devendra Fadnavis

24,389 次观看 • 22 天前

🌧️Brihanmumbai Municipal Corporation has pumped out a total of 16,451.55 million litres (1,645.155 Crore litres) of rainwater between 16th August and 19th August 2025 (till noon) through six pumping stations across Mumbai. 🔹During these 4 days, all pumps at these six pumping stations were operational for a total of 761 hours and 38 minutes. 🔹For comparison, this is more than double the storage capacity of Tulsi Lake, which holds 804.6 Crore litres of water. 🔹Pumping stations where rainwater was pumped out during this period are as follows: 🔹(Name of Pumping Station / Number of Pumps / Maximum Pumping Capacity per second (litres) / Total Pumped Water in Crore litres) 1. Irla – / 8 pumps / 48,000 / 3,768.48 2. Cleveland Bunder – / 7 pumps / 42,000 / 2,906.02 3. Gazdhar Bandh – / 6 pumps / 36,000 / 2,870.11 4. Lovegrove – / 10 pumps / 60,000 / 2,826.50 5. Haji Ali – / 6 pumps / 36,000 / 2,379.78 6. Britannia – / 6 pumps / 36,000 / 1,700.66 7. Total – / 43 pumps / 2,58,000 / 16,451.55 🔹BMC has also deployed 540 dewatering pumps across various low-lying areas in Mumbai, to drain accumulated rainwater. 🔹Today, Mumbai is experiencing extremely heavy rainfall and in the last six hours alone, BMC has pumped out 182.5 crore litres of water through these pumping stations. #MyBMCUpdates #MumbaiRains CMO Maharashtra Ajit Pawar Eknath Shinde - एकनाथ शिंदे Adv. Ashish Shelar - ॲड. आशिष शेलार Mangal Prabhat Lodha

माझी Mumbai, आपली BMC

282,061 次观看 • 1 年前

Mahalaxmi to Get India's First Travellator-Equipped Skywalk Linking Monorail, Metro 3 and Suburban Railway MMRDA has completed approximately 90% of the Mahalaxmi Multimodal Connectivity Project, a landmark initiative that will seamlessly connect Sant Gadge Maharaj Chowk Monorail Station, Metro Line 3 and Mahalaxmi Suburban Railway Station through India's first travellator-equipped skywalk, making travel across Mumbai faster, safer and more convenient. Once operational, the integrated interchange will reduce transfer time by approximately 20 minutes, improve access to the Mumbai Monorail from South Mumbai and Worli, and encourage greater use of public transport through seamless multimodal connectivity. Project Highlights: • Approximately 283-metre-long integrated pedestrian bridge • 11-metre-wide structure for smooth passenger movement • Six travellators with a combined length of 176 metres • Two passenger lifts for universal accessibility • Capacity to accommodate approximately 4,500 passengers every hour Built in one of Mumbai's most utility-congested corridors, the project reflects MMRDA's engineering expertise. A 1,800 mm diameter storm water drain was safely relocated before foundation works began, while adjacent water supply and sewer pipelines remained undisturbed, ensuring uninterrupted civic services throughout construction. The project was also executed without felling a single tree, with traffic managed in close coordination with the Traffic Police and the annual Ganesh Visarjan processions along Sane Guruji Marg continuing without disruption. More than a pedestrian bridge, this is another step towards a truly integrated public transport ecosystem where Metro, Monorail and suburban rail work together as one seamless network for Mumbai. CMO Maharashtra Devendra Fadnavis Eknath Shinde - एकनाथ शिंदे Dr. Sanjay Mukherjee Maha Mumbai Metro Operation Corporation Ltd MAHARASHTRA DGIPR PIB in Maharashtra 🇮🇳 PIB India #MMRDA #MumbaiInMinutes #MultimodalConnectivity #IndiasFirst #TravellatorSkywalk #MumbaiMonorail #MetroLine3 #MumbaiSuburbanRailway #UrbanMobility #Infrastructure #SeamlessConnectivity #SmartCities #Mahalaxmi #RebootingMumbai #PublicTransport

MMRDA

62,061 次观看 • 2 个月前

Bengaluru's Biggest Monsoon Tradition: Flooded Roads and Empty Promises This is Bengaluru. Looking at these visuals, one would think it is a swimming pool, not one of the city's major roads. The irony is that despite endless claims of development, smart infrastructure, and rapid urban growth, the same roads turn into waterlogged stretches every single time it rains. Just look at the water level. Vehicles are struggling to move, commuters are stranded, and residents are forced to wade through flooded roads. This is not an isolated incident or a one-time problem. It has become a recurring story across Bengaluru whenever there is moderate or heavy rainfall. The bigger question is: where are taxpayers' hard-earned money and infrastructure funds going? Citizens pay road tax, property tax, and numerous other charges with the expectation of basic civic amenities. Yet year after year, the city continues to witness the same drainage failures, poor road planning, and lack of accountability.Authorities issue promises after every monsoon, conduct inspections, and announce new projects, but the ground reality remains unchanged. If Bengaluru is truly India's technology capital, why are its residents still battling flooded roads every rainy season? Development cannot be measured by announcements and advertisements alone it must be reflected in the quality of infrastructure that citizens use every day.Until authorities fix the root causes of poor drainage, unplanned construction, and inadequate road infrastructure, Bengaluru's roads will continue to resemble swimming pools rather than the modern urban network that residents deserve. #bangalore #bengaluru #varthur #whitefield #sarjapur #bengalururains Maheshwar Rao.M, IAS Greater Bengaluru Authority BBMP_SWM Cell bbmpcommissioner ಬೆಂಗಳೂರು ನಗರ ಪೊಲೀಸ್‌ BengaluruCityPolice ಬೆಂಗಳೂರು ಸಂಚಾರ ಪೊಲೀಸ್ BengaluruTrafficPolice CP Bengaluru ಪೊಲೀಸ್ ಆಯುಕ್ತ ಬೆಂಗಳೂರು Joint CP, Traffic, Bengaluru alok kumar DGP KARNATAKA ಕರ್ನಾಟಕ ರಾಜ್ಯ ಪೊಲೀಸ್ Karnataka State Police S. Lalitha ChristinMathewPhilip

Karnataka Portfolio

24,552 次观看 • 3 个月前