Pavement work has officially kicked off on the Ogun State section of the Sokoto–Badagry…
@Just_Ozed4.5K followers
13,341 views
30 Comments
Comments from the original post on X (Twitter)

@okandeji
Where is there not so much noise about this project unlike the coaster road?
3 likes

@Just_Ozed
Because no media visibility
5 likes

@abiodun_iskilu
I was there this morning too
3 likes

@KunleGbadamosi1
This road is what should be called boripe nile adi ire. Agbara-Atan-Lusada road.
3 likes

@DonXiXii
Nice work on a basic highway. There is nothing SUPER about this highway. Super should be 10-lanes express way with dual carriage standard guage rail in the median.
2 likes

@yemistik
So who will be driving all the way from Badagry to Sokoto?
1 like

@ayodrave
🤣🤣🤣🤣🤣 naija and fooling sha
1 like

@david_akat64919
Bola Tinubu is preoccupied with VI-Epe and Badagry - Ogun coastal road misnamed Lagos -Calabar & Lagos-Sokoto coastal roads while Sagamu-Benin-Ologbo-Warri-PH and Benin -Auchi-Lokaja roads are literally death traps Unprecedented provincialism
1 like

@Olaworeabi18417
which area of ogun state so soem of us too can check it out
1 like

@Just_Ozed
Agbara to Lusada
1 like

@Olawale95303211
You all are feeding us road constructions but you bubu promised stable electricity ⚡️.
1 like

@Toyosi_UI
Ozed please what section is this exactly on the expressway?
1 like

@Just_Ozed
This Agbara to Lusada

@Toyosi_UI
Bless bro
1 like

@Just_Ozed
Thank you bro ...you too 🙏

@AdesojiMinkail
Is there anyone sponsoring your movement?
1 like

@Just_Ozed
Not at all I fund it

@badmantunde
Do you have the map? Need to see the route
1 like

@Just_Ozed
No I don't for me now
1 like

@H_Okubadejo
The road safety controls n measures as seen in this clip, while carrying out construction work isn't commendable at all.
1 like







