Loading video...
Video Failed to Load
PJR Flyover: A key infrastructure boost for Serilingampally. 🌐 Connecting major hubs like NFCL Jn, GVK, Mehdipatnam & Kondapur. ✅ Eases congestion for 2.7L+ vehicles daily ✅ Saves 10+ mins during peak hours ✅ Enhances connectivity to Hi-Tech City, Financial District & Durgam Cheruvu bridge Smart infrastructure for seamless... show more
43,098 views • 1 year ago •via X (Twitter)
10 Comments

Additional rumble strips for Disc joints relocation thereby reducing the citizens travel on roads n ensuring their maximum stay at homes

Uneven rumble strips are going to break back bone and vehicle suspension system.

Thanks to #KTR anna garu

You are still continuing to operate the U turn right at the mouth of the fly over. How do you think this is going to help in saving 10 mins as claimed by you. This is going to create another big traffic block

But it will Choke near Atrium Mall, Need connectivity to MindSpace Road with a Bridge from ORR side & DLF side 👇

Thanks to kcr government

Thanks to @KTRBRS @KCRBRSPresident @BRSparty . Even though you are not in power, your works are delivering to people

Tell this on Monday evening.

It will be beneficial if the U turn at Nawabs is also closed, kindly think about it.

As seen in the video itself, traffic bottleneck has moved from one place to another, nothing changed except more road added for more traffic
