
P C Mohan
@PCMohanMP • 106,180 subscribers
4th-term BJP LS MP for Bangalore Central | Lok Sabha Panel of Chairpersons | Chairman - Standing Committee on Social Justice and Empowerment | 2-Time MLA |
Shorts
Videos

Bengaluru made suicide drones destroyed terror hubs in Pakistan. #OperationSindoor
P C Mohan881,321 Aufrufe • vor 1 Jahr

Rahul Gandhi drops an “atom bomb” of allegations, but still can’t produce a single explosive proof. If 1,00,250 votes were stolen in Mahadevapura, why wasn’t a case filed in court within 45 days instead of holding a press conference one year later? This is just another drama.
P C Mohan267,725 Aufrufe • vor 1 Jahr

I have repeatedly raised Mahadevapura’s infrastructure concerns with the relevant authorities. Even in the recent meeting with BBMP, I stressed the urgent need to improve roads, fix potholes, and manage traffic. ₹2 Congress coolies peddling lies must first learn the facts.
P C Mohan131,233 Aufrufe • vor 11 Monaten

Titagarh Rail Systems delivers the 1st train set for Bengaluru Metro's Yellow Line. Spanning 18.82 km from RV Road to Bommasandra, this elevated corridor will transform public transport, boost connectivity to Electronic City, reduce traffic, and promote sustainable mobility.
P C Mohan135,281 Aufrufe • vor 1 Jahr

They promised to fill Bengaluru’s potholes in 15 days, but ended up filling their pockets instead?
P C Mohan142,945 Aufrufe • vor 1 Jahr

A show-stopping moment at the Parliament's ongoing Winter Session.
P C Mohan233,850 Aufrufe • vor 3 Jahren

In 2015, the Congress government spent ₹170 Cr on a caste census in Karnataka, then blamed dogs for its flaws. Now in Bengaluru, BBMP is pasting caste stickers without collecting any data. From dogs to data-less drama, Congress’s idea of social justice is a comedy of errors.
P C Mohan73,407 Aufrufe • vor 1 Jahr

Bengaluru Urban DC plans to serve notice to KSCA, RCB, police, and organisers over the Chinnaswamy stampede. But what about the Congress leaders who were sitting on stage? Why are they being spared? This can’t be just a magisterial inquiry. A judicial probe is a must.
P C Mohan74,912 Aufrufe • vor 1 Jahr

This policeman was assigned to serve during the Karnataka Assembly Election 2023. He received the devastating news of his mother's demise while on duty today morning. But he refused to take a leave of absence, valuing his sense of duty over his personal grief. Hats off 🙏
P C Mohan134,202 Aufrufe • vor 3 Jahren

9 Years of Seva transformed Bharat🇮🇳 9 New IIT 9 New IIM 15 New IIIT Stable Govt 12 Cr Toilets Ram Mandir 370 Removal 12 New AIIMS 3.5 Cr Homes 75 new Airports 40 Cr Mudra Loans 50 Cr got Health cover 2.7 lakh Km Rural Roads 12 Cr homes got Tap Water 78,000 Km National Highway
P C Mohan129,740 Aufrufe • vor 3 Jahren

Reviewed Key Rail Projects during the Parliamentary Standing Committee on Railways' study visit to Bengaluru. 1. Whitefield-Kengeri Suburban Rail Project: The 35-km Whitefield-Kengeri suburban rail (Parijatha line) will not be scrapped. The Modi Government-approved DPR for the 149.348-km Bengaluru Suburban Rail Project remains intact. 2. Panathur Railway Underpass (RUB): K-RIDE has already commissioned one vent way of the Panathur Railway Underpass (RUB), and the other will be commissioned by January 2025. 3. Carmelaram Rail Overbridge (ROB): The construction of the railway portion of the Carmelaram Rail Overbridge (ROB) is in progress. However, the approach work has been halted due to delays in land acquisition by the BBMP. 4. New Trains to Kempegowda International Airport: Requested a feasibility study for the introduction of new trains to Kempegowda International Airport from Bengaluru City, especially Whitefield. 5. Bengaluru Cantonment-Whitefield Quadrupling: The quadrupling of the Bengaluru Cantonment to Whitefield section will be completed by June 2025. 6. Doubling Projects: The doubling of the Hosur-Salem line via Yesvantpur station and the Baiyyappanahalli-Hosur line will be completed by August 2025. 7. Status of the Circular Rail Network: a. Oddarahalli-Devanahalli Segment: The survey is complete, and the DPR was submitted to the Railway Board on 23.09.2024 for ₹1638.24 Cr. The Railway Board has requested the complete DPR by February 2025. b. Remaining 6 Segments (Devanahalli-Malur-Heelalige-Hejjala-Solur-Nidavanda-Oddarahalli): The survey work is ongoing. 8. Bengaluru-Mumbai High-speed train: Proposed the introduction of a high-speed train between Bengaluru to Mumbai. 9. MEMU Trains Between Kengeri and Whitefield: Proposed the introduction of additional MEMU trains between Kengeri and Whitefield. 10. Namo Bharat Rapid Rail: Proposed the introduction of Namo Bharat Rapid Rail between Bengaluru-Tumakuru and Bengaluru-Mysuru.
P C Mohan64,510 Aufrufe • vor 1 Jahr
