Loading video...

Video Failed to Load

Go Home

The infrastructure required to launch a rocket of Terran R’s class is immense. At LC-16, we’re moving fast. ✓ Horizontal integration facility (HIF) is energized. This building will house Terran R's stages to be mated and prepared for launch ✓ 135 ton assembly room cranes completed their first proof...

18,629 views • 4 days ago •via X (Twitter)

0 Comments

No comments available

Comments from the original post will appear here

Related Videos

Hey Canada, we have a spaceport! 🇨🇦🚀 NordSpace's beautiful Atlantic Spaceport Complex (ASX) is officially under construction outside the town of St. Lawrence, in Newfoundland and Labrador! With our first launch of a Canadian commercial rocket from a Canadian commercial spaceport set to take flight in the coming weeks, the future of a true sovereign capability for assured access to space has never looked so promising. We're thrilled to share footage of ASX's SLC-02 publicly for the first time. ASX will support NordSpace’s first commercial launch of our Taiga suborbital rocket with Taiga's launch window opening on August 25th 2025. Taiga is powered by the company’s proprietary 3D-printed Hadfield Mk III liquid rocket engine, and the mission is named "Getting Screeched In". The launch window is subject to road and power interruptions due to the ongoing state of emergency in Newfoundland and Labrador. This launch follows a series of successful tests, including a fully integrated rocket test and a month-long qualification campaign for the Hadfield Mk III engine. Both demonstrated rapid refurbishment capabilities and turnarounds between tests, paving the way for reusable and cost-effective launch operations from Canadian soil. ASX is designed to support our Tundra orbital launch vehicle and partner launch vehicles, facilitating a wide range of orbital and suborbital missions situated at a 46 degree latitude. The initial $10M phase of development for the Atlantic Spaceport Complex will feature two sites: 🚀 SLC-01 will feature two launch pads for orbital missions including NordSpace’s Tundra vehicle and international launch partners from the U.S. and Europe. 🚀 SLC-02 will consist of at least one smaller launch pad for suborbital missions, radar systems for vehicle tracking and space domain awareness, and other ground support equipment to enable all launch operations at the ASX. The ASX will also support NordSpace’s broader portfolio, including our SHARP (Supersonic and Hypersonic Applications Research Platform) program. NordSpace’s CEO and founder, Rahul Goel, said, “The start of construction at the Atlantic Spaceport Complex is a seminal moment for Canada. This is not just about building a launch site; it’s about building a future where Canada leads in space exploration, innovation, and security. The ASX is critical national infrastructure that will unlock assured access to space, ensuring our sovereignty and fostering economic growth for generations. We are committed to making the vision of a true sovereign end-to-end space missions capability a reality, and today’s groundbreaking is a testament to our team’s relentless dedication, speed, and capability.” We thank Government of Newfoundland & Labrador, Transport Canada, National Defence, Canadian Space Agency and NAV CANADA for their support.

NordSpace 🇨🇦

65,478 views • 1 year ago

Just 8 days after the final stack of Superheavy-B16. B17's common dome section has been moved to the front of MB1 for stacking operations. As expected, the pace of vehicle assembly will have to increase dramatically in order to keep up with SpaceX's goals for Starship Launch Cadence in 2025. We are rapidly approaching Flight 7, and Booster 17 is the Flight 10 Booster. Assuming SpaceX plans to carry out 20 to 25 launches in 2025, this booster will need to be fully stacked, cryo tested, integrated with its 33 raptor engines, static fire tested, and receive final launch outfitting 8 to 10 weeks from today. To date, the record holder for fastest assembly to launch time is B13 which took 41 weeks from initial stacking to launch. This means the assembly and test campaign for B17 needs to be at least 4 times faster than the previous best (assuming there are no re-flights's of boosters within the next 4 launches). If every booster from here on has one re-flight before B17's inaugural launch, then the assembly to launch process only needs to be around 2 times faster than the current best. I should note that B14 is expected to be the new record holder. If it launches on Jan 10 it will have been just under 40 weeks. Another important detail is that from what we can tell, this a Version 1 Booster. This means that we should expect a minimum of 4 more launches before Pad B is operational. One thing is for sure 2025 is going to be WILD!!! Shoutout to The Ringwatchers discord server for helping me gather the required data on such short notice. Make sure to follow them if you haven't already.

Zack Golden

57,369 views • 1 year ago