At Cape Canaveral, the focus has shifted from below-grade and design development to facility outfitting and concept of operations planning. ✓ Siding and insulation installation continues on the horizontal integration facility ✓ Above-grade concrete poured for the launch mount ✓ Cross-country piping and water tower tank welding advancing ✓...