Video wird geladen...

Video konnte nicht geladen werden

Zur Startseite

Crusoe Managed Inference is now available. Run model inference faster, easier, and more cost-effectively. Large-context AI solutions demand fast outputs, massive throughput, and resilient scaling. Crusoe Managed Inference delivers breakthrough speed & reduced input-token spend.

12,096,815 Aufrufe • vor 8 Monaten •via X (Twitter)

0 Kommentare

Keine Kommentare verfügbar

Kommentare vom Original-Post werden hier angezeigt

Ähnliche Videos

Interview with Nebius Co-Founder Roman Chernin Please like & share this video so that all $NBIS investors on X will see it! :) If you prefer watching on YouTube: Timestamps: 00:00 - Why AI Infrastructure Is So Hard to Understand 00:24 - Market Fragmentation and What Actually Differentiates Providers 01:30 - Consolidation, Segmentation, and the Future AI Cloud Landscape 02:56 - What Analysts and VCs Still Get Wrong About AI Infrastructure 05:34 - Nebius Cloud: Product Readiness and Customer Proof Points 07:42 - Why Inference Workloads Are Exploding 09:11 - Training vs. Inference: How AI Models Actually Reach Production 10:10 - Why Inference Market Share May Concentrate Around a Few Winners 12:36 - Customer Use Cases: Coding, Enterprise AI, and Real-World Adoption 14:01 - Why Integrated Training and Inference Matter Strategically 16:01 - Building Scalable AI Infrastructure With High Utilization 18:24 - Token Factory: Inference as a Managed Service 20:24 - Revolut Case Study: AI-Driven Product Enhancements 22:56 - Token Factory Performance Optimization and Competitive Advantage 25:07 - Scale, Capacity, and Efficiency as Growth Drivers 28:36 - Why Inference Capacity Could Become the Next Major Bottleneck 30:10 - How Nebius Benchmarks Performance Across Providers 33:14 - The Future Size and Shape of the Inference Market 36:38 - Value-Based Pricing: Moving Beyond Cost per GPU Hour 40:55 - How Nebius Wins Deals: Quality, Performance, and Customer Experience 44:53 - Autonomous AI Platforms and the Rise of Agent-Based Models 47:28 - Tavily, Agentic Applications, and the Next Layer of the AI Stack 50:45 - Strategic Trade-Offs: Scaling, Product Roadmap, and Customer Relevance 55:40 - Final Thoughts: Adapting to the Next Shift in AI Workloads Nebius Roman Chernin

Daniel Koss

203,706 Aufrufe • vor 3 Monaten

$AMD $5 Trillion MC Is Inevitable Long Term👑 This thread will focus more on Inference! 2026 EPYC "Venice" $TSM 2nm to save Large GW Scale Inference by 40% more than Prior Turin gen. Context: EPYC Turin achieves ~$0.001 per million tokens for batch inference vs $0.02-$0.12/ million tokens as I wrote the thread below. Venice is going to lower cost down to $0.0005-$0.0006/Million Tokens. OpenAI spent roughly $20B on Inference and Training, where 80-90% of that was for Inference per Analysts. AKA Renting Compute is Expensive AF! In this thread, I want to focus on why most analysts and investors are underestimating the role EPYC "Venice" and future Gen on overall Data center revenue. And $TSM ramping up 2nm supply early is a confirmation that AMD will be a major buyer long term. I will also link the thread the Gap between AMD Analysts & Reality and 2nm Ramp Thread so you have more comprehensive view of what I'm writing here. Before I go into detail this is my 2026 Projection: AI GPUs: $35-$50B EPYC Data Center: $15B-$17B Client Segment: $12-$13B Gaming: $6B Embedded: $4B-$5B Total Revenue $70-$100B Non-GAAP net income $18B-$25B Non-GAAP EPS $10.97-$15.40 Foward P/E 55x-70x= $603-$1,078 AMD's Analysts are projecting $0 Revenue for MI450 and sluggish EPYC Growth. Meaning, all analysts are either full of 💩 or Sexist, you decide! Analysts are also projecting 0% growth on AMD "Secret Weapon" Chip as $MSFT said we are at significant Windows refresh and upgrade cycle. Do you think TSMC would allocate more 2nm supply to $AMD at $0 MI450 revenue and sluggish EPYC? 1. EPYC is going to be the leader in lowest Inference! Current Turin cost saving is 95% vs $NVDA or 98-99% on Inference cost when you factor in renting Inference compute from Amazon Web Services, Microsoft Azure, or $NVDA Neocloud pets. TSMC claimed: 10-15% higher performance at iso-power, 25-30% lower power at iso-speed, and ~15% higher transistor density compared to 3nm. This reduces operational expenses (energy, cooling) while increasing throughput per chip. EPYC Turin achieves ~$0.001 per million tokens for batch inference (via vLLM on models like Llama 3 70B), driven by high core counts and low hardware costs. EPYC Venice offers ~1.7x overall performance and up to 70% more compute capability per core, with up to 256 cores (512 threads). Enhanced vector/AI instructions and open-source firmware (openSIL) optimize for inference workloads. AMD Incorporates AI Engines (now part of AMD's XDNA) for on-chip acceleration, improving efficiency for low-latency and edge inference. This reduces reliance on discrete GPUs, lowering system complexity and TCO. Venice SKUs are projected at $3,000-$15,000 ($5,000 for 256-core flagship), far below NVIDIA Rubin ($50,000-$90,000) or AMD's own MI450 GPUs ($40,000-$50,000). High memory bandwidth (up to 1.6 TB/s) supports efficient batch inference. Venice is designed exactly for Large customers that want to lower Inference Cost and MI450 Helios is for Customers that want Training at lowest TCO, TDP as well as lower Upfront 1GW scale(Full build $35-$40B vs $NVDA $55B-$80B). 2. Real World Example: OpenAI's 2025 inference spend reached ~$20B, escalating to even higher total compute rental (mostly inference) amid token volume growth(from video generating). By 2026, with usage doubling (consistent with industry trends: token demand grows 2-5x YoY), assume OpenAI processes ~1,800 billion million-tokens annually $NVDA Blackwell at $0.02-$0.12 is $36B(most optimized) Rubin is projected to be at $0.01/million tokens or $18B annual Inference Cost vs $AMD Venice $0.0005/million tokens or $0.9B annual Inference Cost => Massive saving for OpenAI or anyone that are paying 80-90% Annual Bill for Inference compute. In short, it is unsustainable to pay this much rent vs owning for all current AI players for the medium to long term. Rubin excels in low-latency decode (if Groq integration from $20B deal in 2027-2028), but Venice dominates batch (80% of inference by 2030). Actual savings depend on deployment scale (OpenAI's 6GW AMD plans), electricity rates, and software maturity. If Rubin only hits $0.03, savings swell to $53.1B vs. $17.1B. 3. Will running Inference on Venice and future Gen slow down response generation in 2026 and beyond? Human perception of "fast enough" for chat, agents, search augmentation, summarization, coding assistance is roughly Meaning, EPYC may generate $100B a year on data center revenue, Hence $MSFT $AMZN $META $GOOGL OpenAI xAI and 42+ Countries are leaning AMD for Inference, because the cost saving is MASSIVE! 4. Regular users (you, me, people using ChatGPT, Claude, Gemini, Grok, Perplexity...) are extremely unlikely to notice any slowdown and in many cases might even experience slightly faster or more consistent response times if the industry heavily shifts toward AMD EPYC for inference. What actually happens when companies save massively on inference? When OpenAI , Anthropic , Gemini , Grok Meta .... save billions on the batch/enterprise/RAG layer using EPYC Venice, they typically do one or more of these things with the savings, none of which make your chat slower but enhancing their bottom line(Profit) ~Keep prices the same → make more profit ~Lower subscription prices / increase free tier limits ~Train bigger & better models more frequently ~Offer longer context windows ~Add more reasoning steps / tool calls / agents per query ~Improve multimodal capabilities ~Build more data centers / reduce throttling during peaks In practice the consumer experience usually gets better, not worse, when inference becomes dramatically cheaper. Prime example is $META leaning AMD heavily or currently AMD largest customer. or Grok 2 to Grok 3 heavily used AMD for Inference saving. And most Grok Users reported Groke responses snappier, not slower. 5. What does this mean for potential Revenue? Noted that TSMC is massively ramping 2nm supply for $AMD both MI450 and EPYC. EPYC Conservative projection: FY2025: $10.5B(best Est) FY2026: $16B FY2027: $29B FY2028: $49B FY2029: $75B FY2030: $100B Large customers: $META OpenAI $MSFT $AMZN $GOOGL xAI (Apple?) Smaller customer: $DELL $HPE $SMCI and 42+ other countries. The roadmap to $5 Trillion is very much inevitable as Inference Cost from Renting or owning $NVDA are too high, but $NVDA will still dominate Training market share, where MI families are likely to take 15-20% market share, but the TAM is also expanding Rapidly. Most Institutions are projecting $2-$3Trillion TAM by 2030. $NVDA said $4 Trillion. Dr. Lisa Su said $1 Trillion+ by 2030. So you decide on how much TAM. If you enjoy this kind of analysis, Slap the Like/Repost and Bookmark to please the X Algo as it is Free.99! If you want to support my work further, consider subscribe to see more in-depth analysis! Alright, that is it. Not Financial Advice!

Mike

102,223 Aufrufe • vor 7 Monaten

Micron is going to $4,000 and once you understand what inference actually is, the number stops sounding crazy (Save this). Dylan Patel just said that by 2030, OpenAI and Anthropic alone will need over 100 gigawatts of compute combined and by 2040, we may not even be measuring AI infrastructure in gigawatts anymore. We may be talking about terawatts. Every single one of those gigawatts needs memory to function. Without it, the compute is worthless. Most people heard that and thought about Nvidia but they should be thinking about Micron. Every AI model generating a response has two phases. The first is prefill, processing your prompt which is compute-heavy and the second is decode generating each word one token at a time and that phase is almost entirely memory-bound, not compute-bound. During decode, the GPU's processing units sit idle more than 95% of the time, waiting for data to arrive from memory. Google confirmed it in a research paper that decode-phase bottlenecks are dominated by memory bandwidth and capacity not raw compute. The GPU is not the bottleneck but the memory feeding the GPU is. This matters because inference is now where all the money lives. Training a model happens once, Inference happens billions of times a day every ChatGPT response, every Claude output, every agentic workflow running in the background and every one of those token streams is a billing event tied directly to memory performance. Adding more GPUs does not fix this because GPUs are already underutilized in inference because they are sitting idle waiting on memory. Adding more memory bandwidth and capacity is what directly reduces token cost, reduces latency, and allows the same cluster to serve dramatically more users simultaneously. Longer context windows compound the problem further, a model running a 1 million token context window requires dramatically more memory per session than a 10,000 token window, and every new model generation pushes context longer. The market treats memory as a downstream beneficiary of Nvidia orders. The correct framework is the opposite, Micron is the upstream constraint on how much value every Nvidia GPU can actually generate at inference scale. Micron guided Q4 to $50 billion in revenue, has HBM4 ramping at twice the pace of the prior generation, and CEO Sanjay Mehrotra has said supply will not catch demand before the end of 2027. At 8x forward earnings on $112 projected FY2027 EPS, Micron is the most undervalued infrastructure company in the entire AI stack. Inference is memory. Memory is Micron and the inference ramp has barely started. Milk Road Pro members are already up massively on this position and we're just getting started. If you want the full breakdown of what we're buying and why, come join us for just a dollar using the link below!

Milk Road AI

128,678 Aufrufe • vor 1 Monat

$MU $SNDK $LITE $VRT NVIDIA and Groq: 2nd and 3rd Order Strategic Infrastructure Effects and Market Implications Public reporting indicates NVIDIA has agreed to acquire Groq for approximately $20,000,000,000 in cash, while excluding Groq’s nascent cloud business from the transaction perimeter. The reported carve-out materially constrains the immediate, direct linkage from the acquisition to incremental, NVIDIA-controlled data center capacity build-out because GroqCloud appears to be the principal channel through which Groq hardware is currently monetized at scale as a service. The infrastructure-market implications therefore depend primarily on post-close product strategy: whether NVIDIA (1) commercializes Groq silicon as a distinct inference product line and drives broad deployment through OEM/ODM channels and partners, (2) uses the acquisition mainly to absorb IP and talent while de-emphasizing standalone Groq hardware volumes, or (3) uses Groq technology to reshape NVIDIA’s own inference systems and networking roadmaps. The dominant transmission mechanism into memory, networking, and facility infrastructure markets is the degree to which NVIDIA shifts incremental inference deployments away from GPU architectures that are tightly coupled to external high-bandwidth memory (HBM) and toward Groq’s current architecture, which emphasizes large on-chip SRAM, deterministic compiler-scheduled execution, and direct chip-to-chip connectivity. Independent and company-published materials describe Groq’s current-generation approach as having no external memory, keeping weights and KV cache on-chip during processing, and requiring model sharding across multiple chips due to limited on-chip SRAM per device. That architectural choice is directionally HBM-negative on a per-accelerator basis and ambiguous for DRAM, NAND, networking, power, and cooling on a per-token basis because the design can reduce memory wall losses and tail-latency overhead while potentially increasing the number of chips and interconnect endpoints required to serve large models and long-context workloads. HBM implications are the most mechanically straightforward but should be framed as second-derivative rather than absolute. If Groq-class inference silicon meaningfully displaces NVIDIA GPU-based inference deployments, incremental HBM bit demand tied to inference growth could be reduced relative to a GPU-only baseline because Groq’s current approach does not appear to attach HBM stacks to each accelerator. However, current market structure suggests HBM remains supply-constrained and is being pulled by multiple vectors including continued GPU training scale and high-capacity inference configurations, with leading suppliers signaling tight conditions extending beyond 2026. In that environment, reduced inference-driven HBM intensity could primarily reallocate scarce HBM supply toward higher-end training and premium inference GPUs rather than creating an outright volume collapse, preserving high utilization of HBM capacity while potentially affecting the slope of pricing power and capacity expansion urgency over a multi-year horizon. The key downside scenario for the HBM complex would be a durable architectural bifurcation where “good-enough” inference shifts disproportionately to HBM-less ASICs across a broad swath of deployments (latency-sensitive, batch-1, cost-per-token optimized), while training remains GPU-HBM dominated; such a split would reduce the portion of future inference compute that naturally monetizes through HBM content and could compress the incremental HBM-per-AI-dollar ratio. The key upside/neutral scenario for HBM is that the supply chain remains fully allocated regardless, with NVIDIA using any “freed” HBM to ship more high-end GPUs into training and long-context inference, especially as roadmaps increase HBM per GPU, sustaining robust aggregate bit demand even if inference becomes more heterogeneous. Conventional DRAM implications split into 2 channels: (1) DRAM wafer capacity diversion into HBM and (2) DDR content per server in AI clusters. Supplier commentary indicates that AI-driven memory demand is supporting elevated DRAM markets more broadly, and HBM production is resource-intensive versus conventional DRAM, tightening supply for DDR products in parallel. A meaningful NVIDIA pivot to an inference architecture that reduces HBM dependence could, at the margin, ease the most acute HBM-driven bottlenecks and allow memory manufacturers more flexibility in balancing DRAM mix, which could be modestly DDR-positive on the supply side (less crowding-out) even if it is DDR-neutral or slightly negative on the demand side (if per-node CPU/DDR requirements decline due to more efficient accelerator utilization). The dominant practical outcome is likely that DDR demand remains supported by broad AI server proliferation and increasing memory footprints at the system level (CPUs, networking stacks, caching layers, retrieval-augmented pipelines), while HBM remains the premium profit pool; therefore, any HBM displacement that increases total server volumes could indirectly keep DDR demand resilient even if DDR per accelerator is not rising materially. NAND flash implications are comparatively indirect and volume-driven rather than architecture-driven. Inference clusters require SSD capacity for model storage, container images, logging, and increasingly for fast local retrieval indices and embedding stores, but the storage footprint per unit of compute is typically smaller than in training pipelines that stage large datasets and checkpoints. If NVIDIA uses Groq to lower inference cost and latency enough to expand the total number of inference deployment locations (regional colocation, enterprise on-prem, sovereign footprints), aggregate SSD attach could rise through geographic fragmentation and replication of model artifacts across more sites, even if per-site storage is modest. The NAND effect is therefore likely to be demand-broadening and mix-positive (datacenter SSDs) but not a primary swing factor versus the macro AI capex cycle and consumer/device cycles. Hard disk drive (HDD) markets should see negligible direct sensitivity because nearline HDD demand is driven by bulk storage and cloud archiving economics, while inference acceleration choices primarily reshape compute and network layers; any HDD benefit would be a tertiary function of overall data center square footage expansion rather than a direct consequence of Groq silicon displacing GPUs. Optical networking implications require separating (1) intra-cluster back-end fabrics that connect accelerators and (2) front-end / data center interconnect (DCI) that connects sites and regions. Groq’s own positioning and third-party reporting suggest scaling beyond a single node or rack relies on high-bandwidth fabrics and, in some described configurations, optical interconnect scaling across hundreds of chips. If NVIDIA commercializes Groq at scale, 2 offsetting forces emerge: lower cost-per-token and improved latency could expand inference throughput and drive more east-west traffic, increasing demand for high-speed switching and optics; conversely, if Groq delivers materially higher utilization and tokens per unit of network bandwidth for certain workloads, the network required per served token could decline. Public NVIDIA materials already indicate an aggressive photonics roadmap aimed at scaling AI factories, including co-packaged optics (CPO) switches and explicit collaboration with Coherent and Lumentum in the silicon photonics supply chain. That linkage is important because it suggests that, independent of Groq, NVIDIA is already pushing optics integration deeper into the switch package to reduce power and increase resiliency; Groq increases the strategic incentive to reduce network power and latency if inference becomes even more distributed and latency-sensitive. For Lumentum and Coherent specifically, the net implication is less about “more optics versus fewer optics” and more about a shift in optics form factor and value capture. Co-packaged optics can reduce reliance on pluggable transceivers in some switch architectures while increasing demand for integrated photonic engines, lasers, fiber attach, packaging processes, and component-level supply. NVIDIA’s own announcements explicitly position Coherent and Lumentum as collaborators in creating the integrated silicon/optics process and supply chain for photonics switches. If Groq accelerates the transition to very large-scale fabrics (more endpoints, higher port speeds, tighter power envelopes), that tends to pull forward CPO adoption and amplifies demand for the underlying photonics components even if the conventional pluggable module TAM is structurally pressured over time. If Groq instead pushes inference toward smaller, more localized pods (closer to users, more regional colocation), that can be optics-positive for DCI and metro connectivity because more sites must be interconnected at high bandwidth with low latency, favoring coherent optics and high-speed interconnect between facilities. The principal risk for optics suppliers is timing and margin structure: a faster move to NVIDIA-driven integrated photonics could concentrate bargaining power and compress margins for commoditized transceiver modules while favoring suppliers with differentiated lasers, integration capability, and qualification depth in NVIDIA’s CPO ecosystem. AEC and copper interconnect implications hinge on whether Groq deployment increases the density of short-reach links inside racks and rows. High-speed copper remains structurally advantaged at very short distances on cost, power, and serviceability, but reaches become constrained as lane speeds and aggregate bandwidth rise, creating a role for active electrical cables (AECs), retimers, and signal-conditioning silicon. Credo explicitly positions its AEC products as enabling reliable lossless 800G connectivity for AI clusters, and the company has highlighted participation at NVIDIA GTC with content focused on extending PCIe/CXL using AECs, indicating relevance to next-generation system topologies that require longer reach and higher signal integrity than passive copper can deliver. If NVIDIA turns Groq into a widely deployed inference card or chassis product, the likely near-term effect is AEC-positive because (1) more inference throughput tends to increase top-of-rack connectivity requirements, (2) distributing inference across more racks and sites increases short-reach links per unit of delivered service, and (3) PCIe-attached accelerator architectures tend to require robust signal conditioning as systems move to PCIe 6.x and beyond. Groq workshop materials explicitly reference GroqCard and GroqNode form factors, reinforcing that PCIe-attached deployment has been central to Groq’s current packaging strategy. The main countervailing risk is that Groq’s deterministic chip-to-chip fabric could be implemented primarily through backplanes and direct board-level connectivity that reduces the need for merchant AECs inside the box; in that case, incremental AEC demand would concentrate more in rack-to-switch and node-to-fabric links rather than within-chassis chip fabrics. Astera Labs implications are connectivity-architecture sensitive and, on balance, skew positive if NVIDIA increases heterogeneity and disaggregation in AI systems. NVIDIA has publicly positioned NVLink Fusion as a pathway for partners to build semi-custom AI infrastructure and has explicitly identified Astera Labs as a partner in that ecosystem, with Astera describing NVLink-related solutions expanding its connectivity platform across PCIe, CXL, and Ethernet plus fleet observability software. A Groq acquisition increases the probability that NVIDIA offers a broader menu of accelerators (training GPUs, inference-focused ASICs) and therefore increases the importance of scalable, high-reliability connectivity, retiming, switching, and telemetry across mixed topologies. If Groq silicon remains PCIe-attached in many deployments, PCIe 6.x retimers/switches and active cable modules become more central, aligning with Astera’s core portfolio. If NVIDIA instead integrates Groq concepts into scale-up fabrics (NVLink-like domains) or uses Groq to expand into inference “appliances” that must be rapidly deployed in colocation environments, the need for standard-compliant, serviceable connectivity with strong RAS/telemetry increases, again aligning with Astera’s positioning. Power equipment and cooling implications for Vertiv and adjacent suppliers should be viewed through the lens of rack power density, cooling modality (air vs liquid), and site deployment model (hyperscale campuses vs distributed colocation/enterprise). Groq claims its LPU and rack designs are “air-cooled by design” and require no complex cooling and power infrastructure, and third-party reporting has described Groq’s approach as relying on parallelism across many lower-power units rather than extreme per-chip performance. If NVIDIA scales Groq as a mainstream inference platform, the mix of data center cooling spend could shift modestly away from the highest-density liquid-cooled racks toward more air-cooled or hybrid deployments, particularly for inference pods placed in existing facilities that cannot easily retrofit for very high rack heat flux. That would be a mix headwind for suppliers most levered exclusively to high-end liquid cooling attachments per rack, but it is not necessarily a volume headwind for Vertiv given the company’s broad exposure to both power and cooling infrastructure and the likelihood that total AI deployment locations expand. Vertiv’s own industry commentary emphasizes that AI racks require higher power-density UPS, batteries, power distribution equipment, and switchgear capable of handling rapid load transients, and that hybrid cooling systems will evolve across deployment environments. Those statements align with a world where inference growth increases the count of powered racks and raises the operational complexity of power delivery even if per-rack density is lower than the most extreme training clusters. The most material infrastructure impact may occur outside the rack and upstream of the data hall: grid interconnects, substations, transformers, switchgear, generators, and utility-scale generation additions. Recent regulatory actions in the U.S. highlight that projected data center demand is already driving large planned increases in electricity generation capacity, underscoring that power availability is a binding constraint. In that context, an inference architecture that lowers joules per token could reduce the power required per unit of inference delivered, but it can also accelerate demand by lowering cost and improving latency, increasing the total volume of inference served (a classic rebound effect). The net outcome is likely continued, elevated demand for power infrastructure even if efficiency improves, with the key swing factor being whether AI capex remains on a multi-year growth trajectory or enters a digestion phase. Other data center infrastructure implications include server/ODM mix, facility design standardization, and networking architecture choices. If NVIDIA positions Groq-based inference as a broadly distributable “standard server + accelerator” solution rather than as an integrated, liquid-cooled rack like GB200 NVL72, spend could shift toward more conventional air-cooled server designs, higher unit volumes of mainstream racks, and faster deployment in colocation footprints, increasing demand for modular power rooms, busways, and rapidly deployable cooling solutions. If NVIDIA instead integrates Groq into its “AI factory” paradigm, the primary effect is likely acceleration of dense back-end fabric build-outs and a faster push toward photonics switching, increasing demand for fiber plant, connectors, and integrated optics supply chains while potentially compressing the lifecycle of transitional architectures based on pluggable optics and mid-reach copper. NVIDIA’s stated roadmap toward co-packaged optics and silicon photonics switches is already oriented toward scaling to very large GPU counts; adding a high-end inference ASIC increases the strategic importance of power-efficient, low-latency fabrics because inference economics become increasingly sensitive to network overhead as compute cost declines. Across the covered segments, the most defensible base case is limited near-term dislocation and a medium-term increase in uncertainty around memory intensity per unit of inference growth. HBM faces the clearest relative risk from an HBM-less inference platform, but supply tightness and GPU training roadmaps reduce the probability of an absolute demand shock over the next 12–24 months. Optical, AEC/copper, and power/cooling are more likely to remain volume-supported because they scale with endpoint count, deployment fragmentation, and total data center footprint, and those tend to rise when inference becomes cheaper and more widely deployed. The highest-conviction second-order effect is a shift in infrastructure mix: incrementally more distributed inference deployments (favoring colocation power/cooling standardization, DCI optics, and serviceable short-reach interconnect) and a gradual migration from pluggable optics toward integrated photonics in back-end fabrics (favoring suppliers positioned in the CPO ecosystem).

TheValueist

76,179 Aufrufe • vor 7 Monaten