Video yükleniyor...

Video Yüklenemedi

Ana Sayfaya Dön

How does the Advanced Technology Chip fab (joint venture between Tesla and SpaceX) look today? Most of the progress is on the main foundation which for now appears rectangular, GeoPiers are at work on the part of the foundation that has had gravel mix placed on the top soil...

16,792 görüntüleme • 2 ay önce •via X (Twitter)

0 Yorum

Yorum bulunmuyor

Orijinal gönderinin yorumları burada görünecek

Benzer Videolar

TERAFAB: Grimes County, TX - September 5th, 2026 Happy Labor Day! Here is my first flyover of the joint Tesla and SpaceX TERAFAB project in Grimes County, Texas. It was a gorgeous day for a flyover. The scattered showers made for a beautiful backdrop. I took this trip a learning expedition to find spots to fly from and how to get as close as possible. I was able to get some amazing footage. The video is in 4 parts. PART I: EARTHWORKS The first maps show the current land acquisitions by WIT TECH LLC, a Musk-linked / SpaceX-adjacent buyer. Compared to the TERAFAB scale I give you an idea of where the current clearing is taking place on the southeastern side of Gibbons Creek Reservoir. There is also a clearing further east with a substantial lake that will eventually need to be drained. PART II: 348.59 ACRE MILLENNIUM POWER PARCEL This is the tract on the west side of the reservoir, directly south of and next to the Grimes County Substation. SpaceX has said it will use natural-gas generators and Megapacks, so it is not clear what this area will be used for. There was a No Drone Video sign, so I only took photos. PART III: SUBSTATION & INTAKE Far to the west on the Navasota River, WIT TECH LLC acquired two parcels. One is a 3.83-acre plot with an 11,000 gal/min pump station. The second is a 1-acre plot on and over the river that includes an intake and low dam. SpaceX says this will be used to divert stormwater into the reservoir. PART IV: 433.79 ACRE ENERGY PARCEL This site sits northwest of the reservoir, between the old, removed coal plant and the 210 MW Grimes County Solar Farm. Tesla and SpaceX have not said what the site will be used for. As always, there is an X Subscriber photo-thread. So please subscribe take a look and support the flyovers. Referral links are at the end of the thread. Thanks everyone!

S.E. Robinson, Jr.

71,696 görüntüleme • 15 gün önce

Many still don’t understand why Elon is building Terafab Terafab is an extension to all the chip makers in the world It’s not about replacement, not a rivalry and absolutely not competing It’s being built to fulfill the massive chip orders that Tesla, SpaceX and xAI actually need TSMC’s most advanced 2nm capacity is totally booked through 2028 Tesla signed a massive $16.5 billion deal with Samsung back in July 2025 to produce AI6 chips at their Taylor, Texas factory and Samsung is building a Tesla Exclusive chip manufacturing plant to full fill this orders When Elon announced Terafab on March 21, 2026...he made it clear: “That rate is much less than we’d like. We either build the Terafab or we don’t have the chips, and we need the chips, so we build the Terafab” He basically told the chip makers: “Produce as much as you comfortably can. We will take them all. Actually we want even more” Even today Elon said: "SpaceX/Tesla will be always be major customers of TSMC and not competitors in the normal sense of the word" Current production rates are much less than they need....That’s why Terafab exists Terafab is an extension to every chip maker… not competition, not rivalry, absolutely not Even Intel has joined as a partner Even if chip supply improves, massive bottlenecks still exist with memory and advanced packaging You simply can't risk those supply chain breaks at this scale That’s why Terafab is being built to vertically integrate everything - chips, memory, advanced packaging all under one roof, targeting 1 terawatt of AI compute capacity per year This is a ludicrous amount of chips that no chipmaker currently produces at this scale. I don't think even TSMC and Samsung truly understand these numbers yet It’s about building the capacity the future actually demands

X Freeze

53,291 görüntüleme • 5 ay önce