Terran R hardware is advancing across multiple fronts, with integration work progressing on stage…
Relativity Space
Visit on X@relativityspace133K followers
31,190 views
Terran R hardware is advancing across multiple fronts, with integration work progressing on stage one and production scaling for future vehicles.
✓ All 13 flight one Aeon R sea-level engines installed onto the thrust structure
✓ All nominal joiners and external stringers approaching completion on stage one
✓ Both interstage barrels were painted and stacked to form the full structure
✓ All flight two barrels complete, first circumferential friction stir welds executed on the flight two stage one tank
✓ Flight three panel fabrication more than halfway complete
5 Comments
Comments from the original post on X (Twitter)

@relativityspace
Full update
24 likes

@shanksteroflove
When might we expect a static fire of the first stage?
1 like

@Crypto_Copper
Very exciting!

@amazingnatxxx
the way they stack interstage barrels like lego rings for something this tall is oddly satisfying

@WandaCase9l
A strong integration milestone. The next proof is whether production cadence and test results keep pace with the hardware stack.