Загрузка видео...

Не удалось загрузить видео

На главную

UPDATE ON ROAD INFRASTRUCTURE by FG not Tinubu. -Sir Peter Obi note this data. Abi Infrastructure no good. 1: Lagos-Calabar Coastal Highway: -(a): Section 1 has been substantially completed. 47.47km -(b): Section Two in Ogun State had reached 60% completion. -(c): Section 3A and 3B in Akwa Ibom and...

19,750 просмотров • 22 дней назад •via X (Twitter)

Комментарии: 0

Нет доступных комментариев

Здесь появятся комментарии из оригинального поста

Похожие видео

Presidential Media Tour: 1,068km Sokoto -Badagry Superhighway Construction by the President of Nigeria Bola Ahmed Tinubu under APC Nigeria 1; this project was PROPOSED in 1978. -(a): 1979, President Shagari worked on it on PAPER. 2: From Obasanjo to Shagari to Tinubu, how many years guys? 46 years. 3: Therefore, the President Bola Ahmed Tinubu approved the project in 2024. -(a): the project is a 6-lane, concrete highway under the Renewed Hope Agenda. 4: Current Status: Construction is underway in sections: -(a): 258km Kebbi axis, 120km Sokoto Section, while 38km x 2 is managed by Dangote Group, 82km by Julius Berger, and 20x 2 km by BUA. -(b): Lovers of Hi-tech, read Nos 4(a) again for the breakdown of the companies involved as per $615 million loan. -(a): Construction project is concrete based and work has reached Gwandu. -(b): CCTV, cameras, solar street lighting will be installed. 5: The project was conceived to connect North West to South West. 6: Presidential team are here to inspect the project to see for themselves how far. BENEFITS: 7: The construction has created, and continues to generate, thousands of jobs with approximately 80% of the workforce comprising Nigerian professionals and local workers. -(a): Boosting income in rural areas. 8: the Highway connects agricultural hubs, making it easier to transport goods and stimulating commerce. 9: the Highway is designed to reduce travel time between Sokoto and Lagos from 13-17 hours to under 6-9 hours respectively. 10: Ogun state axis: 13km of rigid concrete pavement has been laid from the Agbara axis towards Lusada. Concrete pavement is visible in the Atan side. 11: First phases aimed for 2027 with full completion targeted before the President Bola Ahmed Tinubu leaves office Inshallah in 2031. Sunday Akin Dare, CON, FNIS The Toluwani Borokini Foundation THE TROJAN BEAST Temitope Ajayi @OSASwhiteHat Abdullahi A. Yakubu Alaka Tunde Debola J A OSARO tunderahman O'tega Ogra Daddy D.O🇳🇬 TallJohn🌍 Femi Adebayo Kebbi State Government Hon. Aminu Suleiman Senator Abubakar Atiku Bagudu CON JAKADAN KAURAN GWANDU KEBBI BLOG NGN LTD 🇳🇬 Dr. Nasir Idris Better Kaduna🌆 Boss Baby 🌚🌝 Anthony Mustapha M. M. A Austin Effiom Lagos Landlord & Osun, Kwara Tenant🇳🇬 🇺🇬 🇬🇭 Hon. Ọmọtọ́ńsọrẹ̀ fabulous Oduduwa’s 1st Born..⚔️🐆Omo Babayo Omotola 🇳🇬 Ọláńrewájú Ìdòwú jimmyking Alobo Sammy Desh Four Eyes Media

Woye

16,892 просмотров • 2 месяцев назад