Video yükleniyor...

Video Yüklenemedi

Ana Sayfaya Dön

🚨 Update. Ghana Railways has commenced revenue freight operations, moving its first consignment of 20 forty-foot containers by rail from Tema Port to KUT in about 25 minutes. The service is expected to help decongest Tema Port and support round-the-clock freight operations.

16,934 görüntüleme • 1 ay önce •via X (Twitter)

9 Yorum

Kwame profil fotoğrafı
Kwame1 ay önce

A bare minimum. We should be doing more. Waaaay more

Ghana Tech & Infra profil fotoğrafı
Ghana Tech & Infra1 ay önce

That's the plan.

DULEGBÃ AD. 1957 🇬🇭 profil fotoğrafı
DULEGBÃ AD. 1957 🇬🇭1 ay önce

That’s 20 heavy duty container trucks off our roads and posing all kinds of dangers for hours along its travel route permanently. The truck drivers should be retrained to do some other jobs.

Dzifa profil fotoğrafı
Dzifa1 ay önce

Now a railway from Accra to North is needed, or Volta to North, and Accra to Kumasi and Takoradi to North and forget all this plenty airport things

Desi susiani profil fotoğrafı
Desi susiani1 ay önce

Alhamdulilah

bRa_Nii profil fotoğrafı
bRa_Nii1 ay önce

We need this movement from Team to Kumasi and up north

PSAMUEL ⁴⁴ profil fotoğrafı
PSAMUEL ⁴⁴1 ay önce

Nice

Qüån_Chï profil fotoğrafı
Qüån_Chï1 ay önce

They'll just cross another Messi.

Dzifa profil fotoğrafı
Dzifa1 ay önce

Once leadership is fixed, everything else will be in place, problem has always been leadership and not resources

Benzer Videolar

NLC starts work on Dedicated Freight Corridor & Multimodal Logistics Park, Pipri 🇵🇰 Due to absence of rail-based freight transportation system at Karachi Port, congestion of containers has become a routine problem resulting in slow cargo movement & negative impact on economic activities. Heavy road traffic has also led to increased environmental pollution & damage to road infrastructure. The construction of Dedicated Freight Corridor and Multimodal Logistics Park at Pipri offers a long-term solution to these challenges. Ground breaking ceremony of Dedicated Freight Corridor was held with Federal Minister for Railways Hanif Abbasi and Group Chairman and CEO DP World, Sultan Ahmed bin Sulayem attending as chief guests. NLC will complete the project in multiple phases with USD 400 million Foreign Direct Investment. The first phase is scheduled for completion within four months. The project includes rehabilitation of a 52-kilometer railway corridor from Karachi Port to Pipri Marshalling Yard along with development of a modern Multimodal Logistics Park. It is aligned with the China–Pakistan Economic Corridor (CPEC) and Pakistan Railways’ ML-1 Project. Upon completion, import containers will be transported directly by rail from Karachi Port to Pipri and onward to destinations across Pakistan, China, Central Asia and other regional countries. The project is expected to significantly reduce container congestion at Karachi Port, streamline cargo movement, accelerate economic activity and bring marked improvements in traffic management and environmental conditions.

Pakistan Strategic Forum

12,211 görüntüleme • 8 ay önce